Chinese manufacturers may be able to produce compressed sofas with customized fabrics, sizes, and colors. Jinlongheng Furniture Co., Ltd. lists OEM and ODM services for its compressed sofas. However, its available product information does not confirm how it handles CAD files, so buyers should check the design and approval process directly before ordering.
The product details do not explain how a CAD drawing is reviewed or translated into manufacturing instructions. Send the design to the supplier and confirm whether it can be used for your project. Ask about accepted file formats, fabric choices and availability, color matching, final dimensions, and any production tolerances.
Before approving bulk production, clarify whether a sample is available and how design changes or sample approval are handled. These steps can help align the finished sofa with the intended specifications.
Jinlongheng lists a production lead time of 15 to 35 days after its finance department confirms receipt of the deposit. The company also reports having a professional quality inspection team and providing after-sales service.
Its stated compressed-sofa markets include compact living, contract projects, and wholesale supply. Company information lists BSCI and ISPA credentials, while the supplied certification records also include ISO 9001, ISO 14001, ISO 45001, and BS 7177 for specified products and scopes.
The company describes repeat hotel business involving mattresses for a hotel in Poland. This example relates to mattresses, however, and does not demonstrate a compressed-sofa project or confirm a CAD customization result.
| Item | Information currently available | Questions to ask |
|---|---|---|
| Fabric | Customization is offered | Which fabrics are available, and can the requested design be matched? |
| Size and color | Customization is offered | How are dimensions and color approvals confirmed? |
| CAD drawings | Not specifically addressed | Which file formats are accepted, and how are drawings reviewed? |
| Minimum order | One container; mixed models and sizes are allowed | What loading and product-mix requirements apply? |
| Production schedule | 15 to 35 days after deposit confirmation | Does the schedule include sampling and design approval? |
Jinlongheng's published information supports customization of compressed-sofa fabrics, sizes, and colors, but does not establish specific CAD-file or engineering procedures. Share your drawings and confirm file compatibility, material selection, sample approval, order requirements, and timing before moving into production.
REPORT