Yes, you can put custom distressing, label requirements, and packaging instructions into a single shirt project brief. However, only garment washing and distressing are confirmed as DOLUXE services in the available information. Ask the manufacturer to verify label and packaging options before moving into sampling.
Bring all requirements together in one Tech Pack or design brief. Include the shirt’s construction and fit details, the desired distressed finish, label artwork and placement, and any packaging specifications. This gives the factory a clear set of instructions, while allowing any unconfirmed services to be checked early.
DOLUXE lists Tech Pack reproduction, fit development, garment washing, and distressing among its custom capabilities. The company also manufactures streetwear and heavyweight apparel, including T-shirts, hoodies, sweatshirts, pants, jackets, and denim. Its profile mentions techniques such as vintage washing, puff printing, and 3D embroidery. These details do not confirm a specific shirt fabric, distressing process, label selection, or packaging option.
The stated minimum for a custom style is 50 pieces per color, and multiple sizes are supported. Sample development is estimated at 3–15 days, while bulk production is listed at 20–35 days. Actual timing may vary with design complexity, fabric sourcing, and washing requirements, so confirm the schedule after the specifications have been reviewed.
DOLUXE describes its work as OEM manufacturing, ODM design and production, and private-label customization. Its company information includes experience supporting independent streetwear designers and established brands with small-batch production and seasonal releases. A UK online retailer case references private-label product development and repeat drops, but it does not verify particular label or packaging services.
| Requirement | What is confirmed | What to do next |
|---|---|---|
| Custom distressing | Garment washing and distressing are listed for custom styles. | Specify the finish and approve it on a sample. |
| Labels | Available label types and application services are not stated. | Verify label format, artwork, location, and application. |
| Packaging | Packaging choices are not stated. | Confirm materials, presentation, and packing instructions. |
| MOQ and lead times | 50 pieces per style and color; samples take 3–15 days and bulk production 20–35 days, subject to project factors. | Request a project-specific schedule once details and sourcing are assessed. |
Yes. List all three in the same project brief, but confirm label and packaging capabilities directly. The supplied service information confirms distressing only.
The stated MOQ is 50 pieces per style and color. Multiple sizes can be included.
Sample development is estimated at 3–15 days, and bulk production at 20–35 days. Complexity, fabric availability, and washing processes can affect the timeline.
Prepare one brief containing the shirt specifications, distressing references, label details, and packaging instructions. Ask DOLUXE to confirm which label and packaging requirements it can support, then assess the sample before approving the bulk order. For technical questions, contact yutianfang88@gmail.com.
Dongguan City Dule Garment Co.,Ltd is a streetwear and heavyweight apparel OEM/ODM manufacturer founded in 2007 and based in Humen Town, Dongguan, Guangdong. The company reports two factories covering 15,000 square meters in total and an annual production capacity of 1.2 million pieces. It serves markets in North America, Europe, Australia, and Asia, and has worked with a UK online retailer on private-label products and recurring releases.

REPORT