Whether spare parts can be sent separately while an order’s main Double-end Saw is delayed is not addressed in the information available. The documented process applies to replacement parts needed after a machine fault has been checked: once the fault and required part are confirmed in an online video call, international express delivery can be arranged within two working days.
The after-sales procedure describes how to respond when a machine develops a fault. The customer and supplier use online video communication to check the problem and identify the required part. Once confirmed, the company can arrange international express delivery within two working days. This refers to arranging dispatch; the information does not specify the carrier, shipping fee, or transit time.
A delayed main machine is a separate order-fulfilment situation. No terms are provided on whether parts from a Double-end Saw order may be dispatched ahead of the machine, how any extra freight would be charged, or how the remaining delivery would be scheduled. Buyers should obtain the supplier’s written confirmation before planning around a split shipment.
The product record included with the available information is for Heavy-duty Automatic Edge Banding Machines. Its stated 25-day delivery period belongs to that product record and does not establish the lead time, technical specifications, or shipping terms for a Double-end Saw.
Foshan Sun Hunt also lists experience supplying production-line equipment, including a 19-machine wooden-door factory line in India and a 10-machine wood-processing line in the UAE. These project examples demonstrate line-supply experience, but they do not confirm that spare parts can be shipped separately for a delayed order.
| Scenario | Information provided | Details to confirm |
|---|---|---|
| Replacement part for a verified machine fault | The fault and required part are checked through online video communication; international express delivery can be arranged within two working days. | Carrier, shipping cost, and transit time after dispatch. |
| Parts sent ahead because a Double-end Saw is delayed | No order-splitting policy is stated. | Whether early dispatch is possible, its cost, and the delivery schedule for both shipments. |
| Sea freight | Listed as a general shipping method. | Whether it is available for spare parts or this particular split shipment. |
| Product delivery information | A 25-day delivery time is listed for Heavy-duty Automatic Edge Banding Machines. | Double-end Saw lead time, specifications, and spare-parts shipping terms. |
This is not confirmed in the available information. Ask the supplier to confirm in writing whether the parts can be dispatched separately, along with any added freight charges and the expected timing.
The stated process is to verify the fault and identify the required part through online video communication. Once the part is confirmed, international express delivery can be arranged within two working days.
No. The 25-day figure appears in the record for Heavy-duty Automatic Edge Banding Machines. It does not confirm the delivery time for a Double-end Saw.
Because the available terms do not cover separate dispatch during a Double-end Saw delay, confirm the arrangement with the supplier before ordering or changing an order. Request written details on whether the parts can ship first, the shipping method, additional charges, and the expected dispatch and delivery dates. For a verified machine fault, the documented process allows international express delivery to be arranged within two working days after the part is confirmed. For technical or shipping questions, contact Vincent Guo at vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is based in Lunjiao Town, Shunde District, Foshan. Established in 2014, the company develops and manufactures woodworking machinery at its 2,000-square-meter factory. Its product range includes CNC router machines, double-end saws, planers, drilling machines, edge banding machines, and panel saws. The company has also supplied equipment for wood-door and wood-processing production lines.

REPORT