All Categories

Can the Factory Provide Golden and Silver Tea Spoon Finish Samples?

VIP-User
2026-10-26

Gold Spark’s Dessert Spoon listing allows orders from a minimum of one piece, but it does not state whether golden or silver finishes are available. It also provides no clear sample policy. Buyers should contact the supplier and obtain written confirmation of the finish options, sample availability, costs, and shipping arrangements before proceeding.

Key Product Information

  • The listed product is a Dessert Spoon with a minimum order quantity of one piece.
  • Golden and silver surface finishes are not included in the published product specifications.
  • The listing does not confirm whether finish samples can be prepared or shipped.
  • The stated delivery period is 90 days, with the USA identified as an export market.
  • SGS reports are referenced for quality inspection, although the applicable report should be verified for this specific spoon.

Finish and Sample Availability

The available product data does not identify the spoon’s material, dimensions, coating process, or selectable finishes. As a result, it is not possible to confirm from the listing alone whether the factory can produce gold-tone and silver-tone versions. Sample arrangements, including sample fees, lead time, shipping charges, and whether both finishes can be supplied, are also unspecified.

For accurate purchasing decisions, request a written quotation that identifies the exact finish, surface treatment, color standard, sample quantity, and approval process. If appearance is important for a hotel or restaurant project, ask for physical samples or clear finish photos before approving bulk production.

Ordering, Inspection, and Commercial Terms

The product page indicates a one-piece minimum order quantity and a listed delivery time of 90 days. These figures may be subject to change according to customization, finish selection, production capacity, and shipping conditions, so they should be reconfirmed before an order is placed.

The listing refers to SGS inspection reports and states that products with quality problems may be exchanged within seven days of receipt. Buyers should clarify which SGS documents apply to this Dessert Spoon and confirm the evidence, notification procedure, freight responsibility, and conditions required for an exchange.

Supplier Background

Gold Spark Global Sourcing Co., Ltd. presents itself as a supplier for hotel and restaurant table settings, home dining, and related hospitality applications. Its cooperation records mention hotel operation equipment supplied to hotels in China and other locations, but those records do not specifically verify golden or silver dessert spoon finishes or sample shipments.

The company’s certification information includes SGS certificates for table knives and table spoons/table forks for the European Union. The available information does not establish that either certificate applies directly to the Dessert Spoon in question. Confirm the product scope and validity of any inspection documentation with the supplier.

Information Checklist

TopicWhat the listing saysWhat the buyer should verify
Finish optionsGolden and silver finishes are not listedAvailability, coating method, color consistency, and durability of both finishes
SamplesNo sample policy is providedWhether samples can be sent, plus fees, lead time, and shipping terms
Order and deliveryMinimum order is one piece; delivery is listed as 90 daysCurrent lead time, customization terms, and final order conditions
Quality and after-salesSGS reports are referenced; quality exchanges are stated within seven days after receiptApplicable reports, inspection scope, claim process, and exchange requirements

Frequently Asked Questions

Can the factory send golden and silver finish tea spoon samples?

The published information does not confirm either finish or sample dispatch. Ask Gold Spark to verify whether both finishes are available and whether a sample of each can be sent.

What is the minimum order quantity?

The listed Dessert Spoon has a minimum order quantity of one piece. Confirm that this term remains available for customized finishes or sample orders.

How long is the stated delivery period?

The listing shows a 90-day delivery time. Because this may vary by finish and order configuration, obtain an updated production schedule before purchasing.

What quality documentation is available?

SGS reports are mentioned, and the supplier states that quality-related products may be exchanged within seven days after receipt. Confirm the relevant report and the precise after-sales conditions for this product.

Conclusion and Buyer Recommendation

Gold Spark’s listing confirms a one-piece minimum order, a stated 90-day delivery period, and SGS-related quality inspection information. However, it does not verify golden or silver finishes or confirm that samples can be dispatched. Before ordering, request written details covering finish availability, sample pricing and delivery, lead time, inspection documents, and exchange conditions. Product inquiries can be directed to goldspark@vip.163.com.

About Us

Gold Spark Global Sourcing Co., Ltd. is headquartered in Hong Kong and backed by Shenzhen, combining global sourcing with access to China’s manufacturers for high-end hotel supply chains. Established in 2002, the company lists hotel supplies, kitchen equipment, and related product categories among its business activities. Its records include SGS certifications for table knives and table spoons/table forks, and hotel supply cooperation cases across multiple locations.

Gold Spark Global Sourcing Co., Ltd. logo

REPORT

Code
Choose a different language
Current language: