When ordering spoons with custom-colored handles, allow an extra 7–15 days if the design requires a new mold. This is a mold-development estimate, not the complete order lead time. The stated standard schedule is 25–40 days for production, packing, and shipping, so confirm the project timeline with the supplier before placing your order.
Timing depends on the specifications and whether they can be made using an existing production setup. Before the schedule is finalized, clarify the handle color and material, spoon design, stainless steel grade, logo, packaging, order quantity, and any mold requirements.
Huaqiang Metal offers stainless steel cutlery with plastic handles, as well as colorful full-tang cutlery. Listed stainless steel options include grades 410, 430, 304, 316, and 201. Silver and gold finishes are noted for the listed kitchen tongs; check directly whether the desired finish and material combination is available for your custom handle spoon.
Quality checks are carried out at several stages, including raw-material inspection, production, assembly, and final testing. The company reports BSCI, ISO9001, and ISO14001 certifications. Its product and material documentation also includes information related to FDA, LFGB, and REACH compliance, which buyers can review as part of order approval.
The company’s supply experience includes colorful cutlery and kitchen tools for European discount retailers and supermarket channels. Other stated applications include large supermarket chains, homeware stores, star-rated hotels, and premium wedding or light-luxury projects. Packaging choices and production batches can vary across these channels.
| Order type or requirement | How to plan |
|---|---|
| Established cutlery design with no new mold | Plan around the standard 25–40 days for production, packing, and shipping. |
| Custom-colored handle spoon that needs a new mold | Include an additional 7–15-day mold-development stage and confirm how it fits into the production schedule. |
| OEM/ODM order with logo or packaging changes | Approve the artwork, materials, colors, and packaging details before agreeing on a final schedule. |
| Sample or small trial order | Ask for a separate schedule. The product listing for kitchen tongs gives a delivery window of 7–15 days. |
No. That timeframe refers to mold development when a new mold is necessary. The stated standard lead time is 25–40 days for production, packing, and shipping. Confirm the complete schedule for your specific order.
Share the spoon design, handle color and material, stainless steel grade, order quantity, logo requirements, and packaging preferences. Also ask whether the design can use an existing mold or requires a new one.
Yes. OEM/ODM support includes packaging customization and logo engraving. The kitchen tongs product information also lists bulk packaging and customized color boxes; confirm the available options for spoons.
For a custom color handle spoon order, budget 7–15 days for mold development if required, then plan around the standard 25–40-day production, packing, and shipping window. Final timing depends on the confirmed specifications, quantity, and packaging. Review materials and relevant compliance documents before approving production. For technical guidance or assistance, contact eyas2018@126.com.
JIEYANG CITY HUAQIANG METAL INDUSTRY CO., LTD. has 40 years of experience in stainless steel tableware and kitchenware manufacturing, with production, mold, and finished-product facilities in Jieyang City, Guangdong Province. Established in 2006, the company runs a 16,000-square-meter factory and provides OEM/ODM services, logo engraving, and packaging customization. Its reported certifications include BSCI and ISO9001, and it serves customers across multiple industries.

REPORT