For buyers planning to purchase a Double-end Saw, Foshan Sun Hunt lists a normal lead time of approximately 20–35 days. However, the available information does not define a separate production schedule for peak-season orders. Customers should therefore request an updated delivery estimate before confirming their purchase, especially when production deadlines are fixed.
The 20–35-day range should be treated as the starting point for delivery planning. Since seasonal capacity, order volume, customization requirements, and shipping arrangements may affect the final schedule, buyers should communicate with the supplier before placing an order. This confirmation should cover machine completion, inspection, packing, and dispatch timing.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. manufactures a range of equipment, including CNC Router Machines, Double-End Saw Series machines, Planer Machines, Drilling Machines, Edge Banding Machines, and Panel Saws. These products are intended for wood door and window production, solid wood furniture, panel furniture, raw timber, and engineered wood processing.
The company reports a production-control system that includes material sourcing, process parameter management, warehouse handling, packaging, quality inspection, pre-shipment checks, and after-sales support. Before delivery, machines are described as undergoing precision calibration and extended load-running tests. Inspections cover mechanical clearances, positioning precision, control software, surface quality, and potential performance issues.
Foshan Sun Hunt also reports experience with larger equipment projects. Examples include a 19-machine wooden-door production line supplied to a factory in India and a 10-machine wood-processing line delivered to the UAE. These projects indicate that the supplier can support both single-machine purchases and complete line configurations, although they do not confirm a dedicated peak-season lead time.
| Planning Item | Reported Details |
|---|---|
| Regular lead time | Approximately 20–35 days |
| Peak-season lead time | Not separately published; verify with the supplier |
| Minimum order quantity | One set |
| Shipping option | Sea freight |
| Trade terms | EXW, FOB, CIF, and DDP |
Foshan Sun Hunt states a usual lead time of 20–35 days. This is the standard reference range, rather than a guaranteed peak-season schedule.
Yes. The listed minimum order quantity is one set, so buyers may order an individual Double-end Saw.
Use the normal 20–35-day period for initial planning, then obtain written confirmation of the production, inspection, packing, and shipping schedule before ordering.
The available data indicates that a Double-end Saw normally requires 20–35 days for delivery preparation, while no separate peak-season lead time has been published. Buyers should confirm current factory capacity and shipping timing in advance, select the most suitable EXW, FOB, CIF, or DDP arrangement, and account for sea-freight coordination. With a one-set minimum order quantity, customized products, and complete production-line planning available, Foshan Sun Hunt can support both small and larger woodworking projects. For technical details or purchasing assistance, contact vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is based in Lunjiao Town, Shunde District, Foshan City, and develops woodworking machinery for a variety of processing applications. Founded in 2014, the company reports a capacity of 50 medium-sized machines per month, or 600 machines annually. Its primary markets include the Middle East, North America, and Africa.

REPORT