When planning a tooling project, double shot molding usually needs more schedule contingency than standard injection tooling. The added work centers on coordinating the shots, confirming alignment, and proving that the mold performs consistently over repeated cycles. Longterm lists delivery at 35–45 working days for complex precision molds, including double shot molds and overmolds. Its reference for custom plastic injection tooling is 25–40 days.
Both standard and double shot tooling require mold trials and dimensional checks. Double shot work adds validation steps: teams must assess alignment between shots, inspect surfaces, and verify stable operation across multiple cycles. If a trial uncovers a mismatch or another issue, mold adjustments and repeat sampling may delay approval and the planned production start.
Longterm’s service information describes double shot molds and overmolds as high-precision custom tooling. Its inspection capabilities include CMM measurement, surface inspection, and multi-cycle mold trials. These checks help confirm that the tool can repeatedly produce acceptable samples before the project moves toward production.
For standard custom plastic injection tooling, Longterm specifies S50C or P20 mold bases, with cavity steel options including 718H, 1.2738, and S136. Customers can choose cold or hot runner systems. The stated precision tolerance is +/-0.02 mm, and mold life ranges from 50,000 to 1,000,000 shots. Listed quality checks include mold trials, dimensional inspection, and a full pre-shipment inspection.
Double shot projects can also involve more coordination across design, precision machining, tooling, sampling, and sample approval. Longterm says its engineering and manufacturing teams work across these stages. The R&D team uses UG, SolidWorks, and AutoCAD for mold structural design, sample verification, and manufacturing-process optimization.
| Factor | Standard Custom Plastic Injection Tooling | Double Shot or Overmold Tooling |
|---|---|---|
| Stated delivery time | 25–40 days | 35–45 working days for complex precision molds |
| Typical validation | Mold trials, dimensional checks, and pre-shipment inspection | CMM and surface inspection, alignment checks, and multi-cycle trials |
| Schedule risks | Dimensional corrections and trial approval | Shot alignment, repeat-cycle stability, added validation, and mold optimization |
| Support | Online technical assistance, maintenance guidance, and spare parts | Long-term mold optimization and after-sales engineering support |
| Service options | OEM custom injection molds or mold making with injection molding | High-precision custom molds, double shot molds, and overmolds |
The delivery figures are planning references, not a guarantee for every project. Double shot work has a longer stated range for complex precision molds because validation may reveal issues that require adjustments and further trials.
Buyers can reduce avoidable delays by supplying complete drawings or reference samples, agreeing on the mold structure and material requirements early, and including multi-cycle trials and sample approval in the schedule. Early alignment on these inputs helps the teams identify design questions before tooling validation is underway.
Longterm reports experience with projects across consumer electronics, home appliances, automotive, industrial equipment, and daily consumer goods. A French product brand ordered eight sets of consumer electronics shell tooling and reported good alignment and stable trial samples. Other cooperation cases include electronic housing tooling in Italy, home appliance tooling in the USA, and an industrial plastic part mold for Australia.
The company holds ISO 9001:2015 certification for the design, manufacturing, and sales of precision molds and the sales of plastic products.
It requires more complex precision tooling and additional checks for alignment, surface condition, and consistent performance over repeated cycles. Any corrections found during validation can add trial and approval time.
Longterm lists 25–40 days for custom plastic injection tooling and 35–45 working days for complex precision molds, including double shot and overmold work. Confirm the project-specific schedule with the supplier.
Provide complete technical inputs early, confirm the mold design and material choices, and reserve time for repeated trials and sample confirmation before mass production. Longterm also offers sample verification, technical support, mold maintenance guidance, and optimization support.
Longterm Manufacturing Solutions Limited, also known as Longterm Mold, was founded in 2010. It provides mold design, tooling, precision machining, mold manufacturing, and parts production for international customers. The company has 50 employees and designs and manufactures more than 300 molds each year, with about 80% supplied to Europe and North America. Its work spans consumer electronics, home appliances, and industrial equipment, among other sectors.
Compared with standard injection tooling, double shot molding brings extra lead-time exposure from alignment checks, multi-cycle stability testing, surface review, and potential mold optimization. Use the stated 35–45 working days for complex precision molds as an initial reference, versus 25–40 days for standard custom plastic injection tooling. Longterm provides custom mold development, double shot and overmold tooling, and injection molding support. For project-specific technical information, contact rogerluo@longterm-mold.com.