For folding door aluminium profile orders from Xinhe Aluminium, the usual production and order fulfillment period is 15–20 days. The stated minimum order quantity is 3 tons. Sea freight is the available shipping option for these long-shaped materials, although the final transportation time depends on the destination, vessel schedule, and logistics plan.

Lead-Time Overview for Folding Door Orders

  • Production and fulfillment are generally scheduled within 15–20 days.
  • The minimum order quantity for aluminium profiles is 3 tons.
  • Sea freight supports high-volume shipments and is suitable for lengthy aluminium products.
  • The total order-to-arrival timeline must also include inspection, packaging, loading, and destination-specific transit.

How to Plan the Order Schedule

The 15–20-day timeframe refers to the stated delivery period for Xinhe Aluminium’s aluminium profiles. It should not automatically be interpreted as the complete period from purchase order to delivery at the project site. Since a separate ocean transit estimate has not been provided, buyers need to confirm the destination, shipping route, and vessel arrangement before calculating the full lead time.

Project planning should allow time for profile production, any required surface treatment or finish, configuration confirmation, quality checks, protective packing, and container loading. Custom specifications or changes to the folding door design may also require additional coordination before production begins.

Applications and Product Coordination

Folding door profiles can be used for balcony doors, kitchen dividers, walk-in closet partitions, courtyard entrances, exhibition halls, and office reception areas. Each application may involve different profile dimensions, finishes, glass or hardware requirements, and installation conditions. Confirming these details at the quotation stage helps reduce delays during manufacturing and dispatch.

Decorative aluminium profile product for folding door applications

Quality Control and Shipping Preparation

Xinhe Aluminium reports a quality process that includes inspection on the production line, laboratory sampling and testing, and checks on incoming raw materials. The company also holds a Quality Management System Certificate based on GB/T 19001-2016/ISO 9001:2015, together with CNAS laboratory accreditation certificate CNAS L 10434.

Packaging and container preparation can influence the dispatch schedule. In the Hotel Equatorial Penang project, the customer reported stable production planning, delivery in line with the agreed schedule, and protective treatment for aluminium profile and glass edges and corners. For a Singapore data centre project, kraft-paper wrapping and foam corner protection were used to help protect materials during transportation.

Aluminium decorative profile surface detail for folding door orders

Key Order-Planning Factors

Planning Item Stated Information Planning Consideration
Production and fulfillment 15–20 days Use this as the stated aluminium profile production and fulfillment period.
Minimum order quantity 3 tons Confirm that the required volume meets the stated profile MOQ.
Quality checks Available Production inspection, laboratory testing, and incoming material inspection are supported.
Shipping method Sea freight Provides substantial loading capacity for long aluminium materials.
Ocean transit time Not specified Verify the estimated transit period according to the destination and shipping schedule.

Frequently Asked Questions

How long does a typical folding door aluminium profile order take?

The stated production and fulfillment period is 15–20 days. The exact schedule should be reconfirmed based on the folding door design, finish, quantity, and order specifications.

Is sea freight included in the 15–20-day lead time?

The available information identifies 15–20 days as the delivery period for aluminium profiles, but it does not provide a separate sea freight transit time. Buyers should add destination-specific ocean transportation time to the planning schedule.

What is the minimum order quantity?

The stated minimum order quantity for aluminium profiles is 3 tons.

Final Recommendations

When scheduling a folding door project, begin with the 15–20-day production and fulfillment period, then add the applicable sea freight time to the destination. Before confirming the order, verify the 3-ton MOQ, profile and finish requirements, inspection procedures, protective packaging, loading plan, and shipping route. Xinhe Aluminium operates an integrated industrial chain with distribution and direct-sales capabilities. For technical assistance or order support, contact xh@xinhealuminium.com.

About Us

Guangdong Xinhe Aluminium Co., Ltd specializes in the research, development, and manufacture of building, decorative, and industrial aluminium profiles. Founded in 1998, the company operates a 666,670-square-metre production facility and reports annual output of 200,000 tons. Its credentials include ISO 9001:2015 quality management certification and CNAS laboratory accreditation certificate CNAS L 10434. Xinhe Aluminium serves customers across a range of industries and application areas.

Guangdong Xinhe Aluminium Co., Ltd logo

REPORT

Code
Choose a different language
Current language: