All Categories

How Long Does a Standard Mattress Tape Edge Machine Take to Deliver?

VIP-User
2026-11-17

For a standard Double Layer Automatic Tape Edge Machine YT-WB-6, the stated production lead time is 60 days. The machine can be ordered in a quantity of one unit, making it suitable for factories that need to add or upgrade equipment without placing a large-volume order. This product-specific schedule should be distinguished from the company’s general 30-day delivery reference and confirmed together with production planning and shipping requirements.

Lead Time Overview and Main Benefits

  • The listed lead time for the YT-WB-6 Double Layer Automatic Tape Edge Machine is 60 days.
  • The minimum order quantity is one machine, with export availability throughout Asia, Europe, Africa, the Americas, and Oceania.
  • The equipment is intended for high-volume mattress manufacturers, automated production lines, and factory modernization projects.
  • Yuantian supports customers with pre-purchase production planning, installation and commissioning, operator training, and international after-sales service.

Product Specifications and Delivery Considerations

The 60-day schedule applies to the specific YT-WB-6 product listing. The Double Layer Automatic Tape Edge Machine is rated to produce 160 pieces in 8 hours, has a total power requirement of 13 kW, and handles mattress thicknesses from 50 to 450 mm. Its overall dimensions are 22,000 by 4,000 by 1,500 mm, so factory layout and transportation planning should be completed before the order is finalized.

Double Layer Automatic Mattress Tape Edge Machine YT-WB-6

The company also publishes a 30-day delivery reference for its wider industry-and-trade business model. That figure does not replace the product-level schedule shown for the YT-WB-6. Buyers should therefore use 60 days as the initial manufacturing lead-time reference, then allow additional time for inspection, export documentation, inland transport, and international freight.

Quality and shipment preparation are built into the delivery process. Incoming inspections cover steel, electrical components, and transmission parts, while important components undergo three stages of testing. Each completed machine is subjected to a 24-hour no-load and load test. For export orders, Yuantian adds corrosion-resistant and moisture-proof measures, shipping-adaptability checks, and fumigated wooden packaging to support customs clearance and overseas transport.

YUANTIAN Mattress Tape Edge Machine production equipment

Lead-Time and Service Comparison

Planning Reference Available Information
Product-specific manufacturing lead time 60 days for the YT-WB-6 Double Layer Automatic Tape Edge Machine
General company delivery reference 30 days for the broader industry-and-trade business model
Minimum order quantity One machine
Rated production output 160 pieces per 8 hours
Standard sea freight options FCL or LCL shipment with fumigated export packaging
Urgent logistics support Air freight for spare parts and small-sized machines when required

Frequently Asked Questions

Does the 60-day schedule apply to a single standard YT-WB-6 machine?

Yes. The product listing specifies a minimum order of one unit and identifies a 60-day delivery time for the Double Layer Automatic Tape Edge Machine YT-WB-6.

Why does the product show 60 days while the company reference says 30 days?

The 30-day period describes the company’s broader delivery reference, whereas the 60-day period belongs to the individual YT-WB-6 listing. For purchasing and factory scheduling, the product-specific lead time is the more relevant figure.

Which services are available during and after delivery?

Yuantian can assist with factory layout and capacity planning before purchase, professional installation and commissioning, operator and maintenance training, multilingual operating manuals, and global after-sales support. Complete machines also include a one-year free warranty excluding wearing parts, together with 24-hour remote assistance.

Planning Recommendation

Customers ordering a standard YT-WB-6 should budget 60 days for the stated product lead time and then add the transportation period required for the destination. Sea, air, land, or multimodal shipping may be selected according to urgency, machine size, and project cost. The industry-and-trade model accepts orders from one machine, with payment methods including T/T, L/C, negotiable D/P and D/A for long-term customers, Western Union, and PayPal for small orders. For technical planning or delivery support, contact yuantian@yuantian.com.

About Foshan Yuantian Mattress Machinery

Foshan Yuantian Mattress Machinery Co.,Ltd, operating under the YUANTIAN Mattress Machinery brand, was established in Foshan in 1982. The company focuses on the research, development, manufacturing, sales, and service of mattress machinery and spring mattresses. Its 150,000-square-meter production facility supports eight main product series and 146 mattress machinery specifications, with two to three new products introduced annually. Yuantian serves the Chinese market and exports to 110 countries and regions, with exports accounting for 60% of its business. Its qualifications include ISO 9001 certifications for mattress machinery production and associated environmental management activities.

Foshan Yuantian Mattress Machinery Co.,Ltd logo

REPORT

Code
Choose a different language
Current language: