The available information does not specify a calendar schedule for evaluating a 23-seat bus prototype. Instead, it describes approval as dependent on passing inspection-line checks and road testing. A unit should be cleared for shipment only after it has met the applicable requirements.
\nTesting completion, rather than a stated number of days, is the only approval basis provided. The product information says every vehicle receives 100% inspection-line testing and road testing, and that only qualified vehicles are approved for shipment. It does not define a separate evaluation plan or timeline for a 23-seat bus.
\nBefore approving a prototype, confirm that its configuration and performance suit the intended shuttle service. Langqing's listed cooperation projects include a museum tourism vehicle project in Egypt, a shuttle bus project in Cuba, and an airport shuttle project in Argentina. These examples indicate experience with shuttle applications, but they do not establish a 23-seat prototype's test duration or acceptance criteria.
\nThe specifications provided refer to the LQD043+2 electric golf cart, not a 23-seat bus. They include a high-strength composite body, electrophoretic metal chassis, independent suspension, diamond-pattern rubber flooring, hydraulic disc brakes, and full lighting. These details cannot be used to determine how long a different vehicle prototype should be evaluated.
\nLikewise, the listed 15–20-day delivery window applies to the LQD043+2 golf cart. It is not an evaluation period for a 23-seat bus. Langqing describes electric sightseeing vehicles as suitable for tourist attractions, scenic areas, resorts, and hotel guest shuttles; those application notes also do not set a prototype approval schedule.
\n| Evaluation Item | Information Provided |
|---|---|
| 23-seat bus evaluation duration | No fixed period is stated |
| Inspection-line testing | 100% testing is specified |
| Road testing | Required before shipment approval |
| Shipment qualification | Only units that pass are approved for shipment |
| LQD043+2 delivery window |
REPORT Choose a different language
Current language:
|