For a customized container house project, the documented payment arrangement is a 30% T/T advance payment, followed by a 70% balance payable against a copy of the bill of lading. This 30% figure should be viewed as a project-specific reference rather than a universal requirement. Before payment, the quotation and contract should clearly define the product scope, selected configuration, inspection documentation and delivery responsibilities.
A 30% T/T prepayment is the documented reference for this project-based purchasing and cooperation model. The balance of 70% is associated with presentation of a bill of lading copy. This establishes the payment approach described for the supplied business profile, but it does not mean that every customized container house order must use the same percentage.
The payment schedule should be reviewed together with the written quotation. That document should specify the selected model, configuration, quantity, included and excluded items, quotation validity, production assumptions and expected timeline. It should also allocate responsibility for packing, freight, customs clearance, unloading, site foundations, assembly, utility connections, inspection and final acceptance.
Customization normally starts with the intended application, project location, number of occupants, required quantity, site size, access conditions, available utilities, preferred layout, equipment requirements and target completion date. Existing drawings, site photos and technical information can help the supplier prepare a more accurate proposal. An initial design enquiry should not be interpreted as confirmation of a standard conversion, fixed dimensions or immediately available inventory.

The selected model also affects the commercial assessment. For folding-expandable units, the available information refers to F20 Mini, F20 Basic, F20 Pro and higher-ceiling versions. Buyers should verify the final drawings, electrical specifications, package quantities, material details and relevant performance documentation before releasing the deposit.
A clear payment schedule should be supported by agreed inspection and acceptance evidence. The supplied company profile lists ISO 9001:2015 Quality Management System Certification for the processing of prefabricated buildings, including container houses, as well as EN 1090-1:2009+A1:2011 factory production control certification for specified steel structures. These credentials can support supplier evaluation, but they do not replace model-specific checks, project inspections or approvals required by local authorities.
Recorded cooperation examples include worker accommodation in Uzbekistan, residential container homes in the United States, villa developments in Tanzania, modular event accommodation in Qatar, staff housing in Thailand, a modular school in Malaysia and an outdoor camp in Azerbaijan. These projects demonstrate different applications and locations; they do not prove that the same design, payment schedule or logistics responsibilities will apply to a new order.
| Item to review | Documented reference | What to confirm |
|---|---|---|
| Deposit | 30% T/T prepayment | Verify the payment trigger, currency, beneficiary bank information and contractual terms. |
| Final balance | 70% against a bill of lading copy | Specify which bill of lading document is required and when payment releases the shipment. |
| Product configuration | Final model and configuration stated in the quotation | Review drawings, dimensions, materials, equipment and packing details. |
| Inspection | Acceptance based on agreed specifications | Define inspection points, evidence requirements and each party's acceptance duties. |
| Transportation | FCL or LCL sea freight is listed | Separate freight from customs, unloading, foundations, installation and utility connections. |
| After-sales service | Determined for each project; no universal warranty is stated | Record the support provider, service scope and warranty terms in the agreement. |
No. The documented terms show a 30% T/T advance payment and a 70% balance against a bill of lading copy, but they do not create a universal rule. The applicable arrangement must be confirmed in the project quotation and signed agreement.
Confirm the model, technical drawings, configuration, quantity, materials, equipment scope, inspection standards, packing method, freight, customs, unloading, foundations, installation, utility connections, acceptance conditions and the responsibilities assigned to both parties.
Only the written quotation can determine what is included. The building package, optional equipment, interior materials and accessories should be itemized separately. Discussions relating to BFC procurement and YOUTOME buildings do not automatically create a single combined scope.
The documented starting point for a customized container house purchase is a 30% T/T prepayment, with the remaining 70% payable against a copy of the bill of lading. Buyers should use this only as a project reference and obtain written confirmation of the exact design, configuration, inspection records, shipping method and delivery obligations. Because this is a project-based cooperation model, quantity, schedule and after-sales support should be agreed separately for every order. For technical solutions or project assistance, contact us at bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME, an independently operated brand within the BFC ecosystem that focuses on housing and adaptable physical spaces. Founded in 2012, the company presents light-steel homes, folding-expandable houses and modular spaces for residential, hospitality, commercial, workplace and community applications. Its website supports project discussions based on the intended use, users, location, configuration and responsibilities defined for each proposal. Listed credentials include ISO 45001:2018 Occupational Health and Safety Management System Certification and ISO 9001:2015 Quality Management System Certification.

REPORT