When an ODM factory asks to move a shipping date, treat the request as a change to the production plan that needs verification and written approval. Start by asking why the schedule has changed, what production work is complete, what remains, and when the order can now ship. Then check the effect on inspection, packaging, payment, and final delivery before accepting a new date.
\nAsk the factory to provide an updated timeline in writing, including the affected production stage and the revised completion and shipping dates. Compare this plan with the original 25–30-day delivery window, and keep a record of any agreed adjustment in the purchase and production documents.
\nConfirm that the revised timeline still allows for product testing and 100% inspection before shipment. Also verify packaging readiness and the arrangements for delivery to the address designated by the customer. A date change should not silently alter the agreed quality checks or delivery requirements.
\nFor the watch wireless charger series, ensure that the approved product configuration remains unchanged: USB 2.0 Type-C input, Type-C output, Type-C input power up to 240W, magnetic wireless charging, watch charging up to 2.5W, and compatibility with all Apple Watches. Any proposed specification change should be reviewed and approved separately from the shipping adjustment.
\nThe stated business arrangement is OEM/ODM manufacturing and processing, with a minimum order quantity of 1,000 pieces and a typical delivery period of 25–30 days. The factory's stated quality process includes 100% inspection before shipment. Keep these terms in place unless both parties document a change.
\nPayment is specified as a 30% deposit, followed by the remaining 70% before shipment. Check that the revised shipping date still works with the balance-payment milestone. Before dispatch, reconfirm the delivery address, receiving time, and contact person, including for delivery arranged by dedicated vehicle.
\n| Control Point | \nWhat to Verify | \n
|---|---|
| Revised timeline | \nWritten explanation, production status, remaining work, and updated shipping date compared with the original 25–30-day window | \n
| Quality and product | \n100% pre-shipment inspection and continued compliance with the approved Type-C, magnetic charging, power, and compatibility requirements | \n
| Payment | \n30% deposit and 70% balance due before shipment, unless a different arrangement is documented | \n
| Delivery | \nConfirmed destination, receiving time, and recipient contact details | \n
Dongguan Fabit Technology Co.,Ltd operates under the FABIT brand and was established in 2014. The company reports a 36,000-square-meter factory, five automated production systems, a professional laboratory, advanced testing equipment, and an R&D team of 10 experienced engineers. Its development program introduces approximately 15 new products each month.
\nFABIT manufactures consumer electronics accessories including charging and audio cables, adapters, card readers, docking stations, wireless chargers, and high-frequency cables. Its services cover product definition, industrial and structural design, packaging development, mass production, and delivery. ROHS and CE certifications are listed for relevant phone and computer accessories. The company has also completed a customized charging and data cable project for a consumer electronics brand in Argentina. Its watch wireless charger products are offered to OEM/ODM customers in Europe, North America, Southeast Asia, the Middle East,