A leak discovered after a prefab capsule house has been installed should be treated as a project issue that needs evidence-based investigation. The cause and responsibility should be assessed against the approved drawings, specified materials, installation scope and agreed acceptance requirements. Inspection, repairs, replacement, transportation and ongoing support depend on the written terms for that project. YOUTOME confirms after-sales arrangements and any warranty on a project-by-project basis; it does not state a universal warranty or response obligation.
Start by distinguishing the building envelope from equipment, later fittings and work carried out on site. The quotation and project agreement should specify the model and configuration, materials, drawings, installation responsibilities, utility connections, acceptance criteria and after-sales terms. A product-family name or display image alone does not define the construction details of the delivered unit.
The intended use also affects what should be reviewed. For everyday living, consider sleeping and storage areas, personal workspaces and utility connections. For accommodation or hospitality, include guest spaces, cleaning, maintenance and local operating responsibilities. These use cases are planning considerations; they do not confirm residential or hospitality approval, or guarantee a particular building specification.
YOUTOME discusses folding-expandable housing and adaptable modular spaces. One reference, the F40 Pro with a 2.4 m ceiling, has expanded dimensions of 11500 x 6800 x 2560 mm and folded dimensions of 11500 x 2200 x 2560 mm. Its listed internal dimensions are 11500 x 6640 x 2400 mm, with a reference area of 78.2 sqm and a layout of three bedrooms, one living room and one bathroom. Confirm the actual configuration, insulation, fit-out and delivery scope in the project documents.
Company credentials include an ISO 9001:2015 Quality Management System Certificate and a Certificate of Conformity of the Factory Production Control under EN 1090-1:2009+A1:2011. These certificates do not establish that an individual installed unit is leak-free or determine who is responsible for a particular repair.
Recorded cooperation examples include worker accommodation in Uzbekistan, residential container housing in America and villa projects in Tanzania. They reflect experience with different applications and locations, but do not demonstrate that another project uses the same materials, installation method or warranty terms.
| Review item | Useful evidence or action |
|---|---|
| Possible leak source | Photographs, location and date records, weather observations, and inspection of openings, joints, roof and wall areas |
| Delivered configuration | Approved drawings, exact model, material and insulation specifications, and fit-out list |
| Installation scope | Written allocation of responsibilities for unloading, foundations, installation, utility connections and acceptance |
| Repair and after-sales support | Project-specific support terms, responsible parties and any agreed warranty; no universal warranty is stated |
| Work completion | Inspection records and agreed acceptance criteria documented after corrective work |
No universal warranty is stated. After-sales support and any warranty are agreed for each project. Refer to the written agreement for the responsible parties, scope of support and applicable conditions.
No. The cause needs to be assessed against the specific unit, approved drawings, materials, installation work, site conditions and utility connections. A product name or reference image cannot establish the cause on its own.
Provide the project identification, country and city, exact model, installation date, leak location, photographs, affected areas and site conditions. Include details of any modifications, along with the relevant quotation, drawings and acceptance records.
Keep a clear record of the leak, take reasonable steps to limit further damage, and compare the installed condition with the agreed specification. Then request a defined inspection and corrective-action plan through the project’s agreed support route. YOUTOME handles purchases and cooperation on a project basis, with quantities, delivery timing, quality inspection and after-sales support confirmed in the written quotation or agreement. For technical guidance or project support, contact bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME as an independently managed brand focused on housing and adaptable physical spaces. Its concepts include folding-expandable housing and modular spaces for living, stays, business, work and community applications. Products, configurations, responsibilities and commercial terms are confirmed for each project. BFC works with a network of modular building and component suppliers to coordinate solutions around intended use, site conditions, climate, transport and installation requirements.