Future product updates do not necessarily require a completely new injection mould. With revision requirements considered during the initial tooling plan, the mould structure can be prepared for selected design changes. Longterm's custom double shot overmolding moulds provide options such as multiple cavities, accurate alignment, hard-and-soft material combinations, maintenance, replacement parts, and technical assistance for later modifications.
The first step is to identify which product features are unlikely to change and which may be revised. For double shot applications, this review should cover the two-color structure, material pairing, cavity count, critical dimensions, interfaces between materials, and functional or cosmetic surfaces.
Products may require combinations such as ABS with TPU or PP with TPE. They may also need precise registration between the two injected materials or a multi-cavity layout for higher production output. Defining these requirements before mould construction helps the toolmaker choose an appropriate mould architecture and leave practical options for future adjustments.
A revision-ready tooling strategy depends on separating permanent design requirements from areas that may evolve. The customer and mould manufacturer should agree on the fixed dimensions, changeable features, material boundaries, alignment details, and inspection criteria. This information can then guide the selection of inserts, cavity arrangements, steel specifications, and other structural elements.
Longterm's custom double shot overmolding moulds use 718H or 1.2738 mould steel and offer a stated service life of up to 800,000 shots. The listed delivery period is 25 to 40 days, and the minimum order quantity is one set. These specifications should be assessed alongside the projected production volume, expected product life, and likely revision schedule before tooling begins.
Sample mould trials and dimensional testing provide an opportunity to confirm part quality before shipment. Pre-shipment inspection can also verify that the mould meets the agreed requirements. If the product later changes, online technical support, mould maintenance, spare parts, and long-term optimization services can assist with evaluation and adjustment.
| Evaluation Area | Available Capability and Revision Benefit |
|---|---|
| Material selection | Supports ABS plus TPU and PP plus TPE combinations for hard-and-soft overmolded components. |
| Mould configuration | Provides a two-color injection structure, high-precision alignment, and optional multi-cavity arrangements. |
| Quality verification | Includes mould trial runs, dimensional testing, and inspection before shipment. |
| Post-delivery service | Includes online technical assistance, mould maintenance, spare parts, and continuing mould optimization. |
| Production scope | Available from one mould set, with mould development that can be combined with plastic injection mass production. |
Yes, provided the expected revision areas are discussed before the mould structure is finalized. Material combinations, cavity planning, alignment features, critical dimensions, and replaceable or adjustable elements should be reviewed during the design stage.
Provide product drawings or samples, the two-color injection requirements, selected materials, cavity quantity, important tolerances, surface specifications, inspection standards, and a clear indication of which features may change later.
The mould should be assessed against the revised product requirements. Depending on the scale of the change, the solution may involve maintenance, replacement components, mould optimization, or a technical adjustment. Longterm lists online technical support and spare parts supply among its after-sales services.
An injection mould can be planned for future product revisions when the possible changes are identified early and reflected in the tooling strategy. For a double shot overmolding project, discuss the material pairing, two-color structure, alignment accuracy, cavity plan, inspection process, steel selection, and maintenance approach with the manufacturer. Longterm provides OEM custom plastic injection moulds, custom mould making with injection moulding, precision and overmolding moulds, and mould development combined with plastic injection mass production. Technical enquiries can be directed to rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited was established in 2010 and supplies mould manufacturing services to customers in the United States, Europe, Australia, and other international markets. Its capabilities cover mould design, tooling, precision machining, mould production, and parts manufacturing. The company has 50 employees, including five R&D engineers focused on injection mould structure, precision CNC components, sample validation, and process improvement. Longterm holds ISO 9001:2015 certification and serves customers in several industrial sectors.

REPORT