When buying a Double-end Saw from overseas, put the payment schedule, inspection steps, shipping arrangement, and required documents in a signed sales contract. Foshan Sun Hunt lists a T/T arrangement described as a 30% deposit and a 70% balance before loading, but the same entry is headed “100% payment by T/T.” Have the seller clarify this difference in the pro forma invoice and contract before sending funds.
A payment arrangement is easier to manage when each transfer is tied to a specific order milestone. The available company information describes a 30% T/T deposit followed by a 70% balance before loading, while its payment-method heading says “100% payment by T/T.” Request corrected wording on the invoice and contract, including amounts, currencies, and due dates, before making a transfer.
Sight L/C and a combined T/T-L/C arrangement are also listed, but no detailed documentary conditions, bank charges, or payment allocation are provided. Before selecting either option, ask the seller and issuing bank to confirm the documents required, presentation deadlines, fees, and the conditions for releasing each payment.
Shipping terms determine how transport costs and responsibilities are divided. The supplied descriptions say EXW makes the buyer responsible for arrangements after the goods are ready at the factory, unless otherwise agreed. Under FOB, the seller handles export formalities and delivers the goods on board the nominated vessel. CIF covers the goods, ocean freight, and minimum cargo insurance to the destination port. DDP is described as delivery to the buyer’s nominated destination with local clearance and transport arrangements. Write the named ports or destination and all included or excluded charges into the contract.
Foshan Sun Hunt reports providing a 19-machine production line to a wooden-door factory in India and a 10-machine wood-processing line in the UAE. These examples concern production-line projects; the supplied information does not say what payment terms those customers used.
The company says its quality process includes machine testing and a separate inspection before container loading. If inspection is part of your payment decision, spell out the checks, evidence to be supplied, and timing in the contract. The listed T/T description makes the balance due before loading, but does not state that payment depends on inspection approval.
| Option or term | Information provided | Confirm before committing |
|---|---|---|
| T/T | The description gives a 30% deposit and 70% balance before loading; its heading also says 100% T/T. | Get the discrepancy resolved and record the exact amounts and due dates. |
| Sight L/C | Listed as an available payment method. | Agree on documents, presentation conditions, timing, and bank charges with the seller and bank. |
| Combined T/T and L/C | Listed as another payment option. | Specify the portion paid by each method and the release conditions for each payment. |
| EXW | Goods are prepared at the factory; subsequent loading and transport arrangements generally fall to the buyer unless agreed otherwise. | Clarify loading, export clearance, and transport responsibilities. |
| FOB | The seller handles export formalities and delivers the goods aboard the nominated vessel. | Name the port and confirm the handover point and costs after delivery on board. |
| CIF or DDP | CIF includes cost, ocean freight, and minimum cargo insurance to the destination port. DDP is described as delivery to the designated destination with clearance and transport arrangements. | Confirm the destination, insurance scope, included charges, and local responsibilities. |
That schedule appears in the T/T description, but the heading for the same method says “100% payment by T/T.” Ask for a corrected invoice and contract that state the agreed amounts and payment dates before transferring money.
No comparison of payment risks or detailed L/C procedure is provided. Sight L/C is listed as an option, so review its documentary conditions and charges with the bank and record the agreed terms in the contract.
The company describes an inspection before container loading, while the listed T/T schedule says the balance is due before loading. The information does not make payment conditional on inspection. If you require that condition, agree in advance on the inspection criteria, evidence, and payment trigger.
Before ordering a Double-end Saw, ensure the contract clearly connects every payment to an agreed date or milestone and sets out each party’s shipping responsibilities. Resolve the conflicting T/T wording in writing. If choosing sight L/C or a combined payment method, confirm its documents and costs with the seller and bank. Foshan Sun Hunt states that it accepts orders from one set and gives a typical delivery period of 20–35 days for its business model; verify the lead time for your specific machine and order. For technical or order support, contact Vincent Guo at vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is located in Lunjiao Town, Shunde District, Foshan City. The company develops and manufactures woodworking machinery for a range of processing requirements. It reports capacity of 50 medium-sized machines per month, with key markets in the Middle East, North America, and Africa, and has supplied production-line equipment to customers in India and the UAE.

REPORT