The most reliable way to verify when premade fan cartons will ship is to obtain an order-specific dispatch date directly from UBEMAY. General production estimates can provide context, but they should not be treated as confirmation for this particular carton order. After dispatch, compare the supplier's stated date with the shipment record or tracking information.
UBEMAY's general company information indicates that stock orders usually require about four days, while customized or private-label orders generally take around ten days. These figures are subject to factors such as order volume, packaging specifications, and customization requirements. They do not establish a guaranteed shipping date for premade fan cartons.
It is also important to distinguish the dispatch date from the final delivery date. Dispatch refers to the point at which the order leaves the supplier's facility. Transit time will then vary according to the destination and the selected freight method. Request both the expected dispatch date and the estimated transit period when confirming the order schedule.
A separate product record mentions a seven-day delivery period and a 15–30-day range for customized orders, but that record relates to professional lash extension accessories rather than premade fan cartons. Those figures should therefore not be used to estimate the carton shipment date.
UBEMAY identifies DHL, FedEx, UPS, other express services, air freight, sea freight, and DDP as available shipping options. The appropriate method depends on the quantity, product type, destination, and delivery requirements. Ask the supplier to state which option applies to the order and whether the quoted date is the dispatch date or the expected arrival date.
UBEMAY describes its customers as professional lash salons, training academies, independent lash artists, wholesalers, distributors, retailers, and private-label brands. The company also cites a cooperation example involving a Brazilian distributor purchasing eyelash extension fans and accessories. However, this example does not provide a verified shipping date for premade fan cartons.
The listed quality controls cover incoming materials, production processes, finished products, packaging, and pre-shipment inspection. These procedures may support product consistency, but they do not by themselves confirm when a carton order will leave the facility.
UBEMAY also lists FDA Cosmetic Product Listing for UV eyelash extension glue, FDA credentials for eyelash extension products, and CE (LVD) and CE (EMC) certifications for an LED lash glue curing lamp. These credentials apply to the specified products and have no direct bearing on the dispatch date of premade fan cartons.
| Reference | Published information | Required confirmation for premade fan cartons |
|---|---|---|
| Stock order | Generally four days | Confirm that the cartons are in stock and that this estimate applies to the order. |
| Customized or private-label order | Normally ten days, depending on quantity, packaging, and customization | Confirm whether the requested specifications extend the production or dispatch date. |
| Professional lash accessory record | Seven-day delivery; customized orders may take 15–30 days | Do not use these figures for fan cartons; request the carton-specific schedule instead. |
In short, the actual shipping date can only be verified through a written dispatch commitment for the specific premade fan carton order, followed by confirmation in the shipment record once the goods have been released.
REPORT