Seasonal demand can affect production slots and shipping schedules, so plan a Double-end Saw order around confirmed dates rather than a general estimate. Foshan Sun Hunt lists a typical delivery time of 20–35 days for business orders. However, this is not a guaranteed lead time for every saw configuration or a commitment for peak-season orders.
Send the supplier the required machine configuration, quantity, destination, and target delivery window as early as possible. Before confirming the order, request a written schedule showing the expected production period, inspection date, and dispatch date. Ask specifically for the lead time applicable to your Double-end Saw and order details.
Make clear whether the machine will use standard specifications or require customization. Foshan Sun Hunt accepts non-standard customized products and provides production-line solutions; the schedule should therefore reflect the exact scope of work rather than rely on a general estimate.
Set the pre-shipment inspection (PSI) requirements before production is finished. Foshan Sun Hunt describes final checks for machines, spare parts, consumables, tools, appearance, packaging, and documents against the order. Confirm which items and records are required, and agree how any discrepancies will be handled before container loading.
Include export packing and transport in the same schedule. The company reports using reinforced wooden cases for export and offers sea freight with EXW, FOB, CIF, and DDP terms. Confirm the selected trade term, freight arrangements, customs responsibilities, destination delivery, and the planned dispatch date. Sea transit and any onward transport should be factored into the delivery window.
| Order factor | Available information | What to confirm |
|---|---|---|
| Lead time | Normal delivery is listed as 20–35 days for business orders. | Get a written estimate for the specific Double-end Saw, configuration, and season. |
| Customization | Non-standard products and production-line solutions are available. | Finalize specifications and confirm how custom work affects the production slot. |
| Pre-shipment inspection | Checks may cover order items, appearance, packaging, and documentation. | Agree on the inspection scope and resolve issues before loading. |
| Transport | Sea shipping and EXW, FOB, CIF, and DDP terms are listed. | Document freight, customs, destination responsibilities, and dispatch arrangements. |
Foshan Sun Hunt Machinery Co., Ltd. is located in Lunjiao, Shunde District, Foshan. The company reports a 2,000-square-meter factory and annual capacity of 600 medium-sized machines. Its management framework covers source control, production parameters, warehousing, packaging, quality control, pre-shipment inspection, and after-sales support. These company-wide details provide context, but they do not establish a season-specific capacity or lead time for an individual Double-end Saw.
The company also reports wood-door and wood-processing production-line projects in India and the UAE, including a 19-machine project in India and a 10-machine project in the UAE. For your own order, use a confirmed production plan rather than inferring availability from these examples.
No. It is stated as the normal delivery time for business orders, but no product-specific or seasonal guarantee is provided. Request a written estimate for the exact configuration and order period.
Confirm the machine specification and quantity, customization scope, production and delivery dates, inspection criteria, packaging, shipping term, and payment arrangement. The listed payment options include T/T and L/C at sight. The payment description also refers to a 30% T/T deposit and a 70% balance before loading.
Planning the inspection in advance can help identify order, packaging, or documentation issues before loading. Agree on inspection readiness and transport responsibilities early, especially when the shipment is time-sensitive.
Reduce seasonal uncertainty by locking down the machine configuration, confirming a production slot and order-specific lead time, and documenting inspection, packaging, freight, and dispatch responsibilities. Treat the 20–35-day figure as a general reference, not a peak-season promise. For scheduling or order questions, contact Vincent Guo at vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. develops and manufactures woodworking machinery in Lunjiao Town, Shunde District, Foshan. The company cites an experienced management and R&D team, a 2,000-square-meter factory, and annual production capacity of 600 medium-sized machines. Its cooperation cases include wood-door and wood-processing production-line projects in India and the UAE.