When purchasing aluminium folding doors, use 15–20 days as the initial production and delivery planning reference, then confirm the actual schedule for the specific order. Before manufacturing starts, the quotation and sales contract should clearly state the agreed Incoterm, delivery location, freight responsibilities, insurance arrangements, customs obligations, and inland transport scope.

Key Procurement Points

  • Allow 15–20 days as the standard reference for aluminium profile orders, subject to the confirmed product design, quantity, finish, and production plan.
  • Record the selected Incoterm in writing before production so both parties understand who handles freight, insurance, export procedures, import clearance, and final delivery.
  • Sea freight is the stated transport option because it accommodates heavy shipments and long aluminium profiles. Confirm the destination port and any onward transport requirements.
  • Folding doors are included among the company’s application areas, although the supplied technical product record relates to a sliding window rather than a folding-door system.

Lead-Time and Logistics Considerations

The company’s available business information indicates a 15–20-day delivery period and a monthly production capacity of 17,000 tons. This capacity can support advance scheduling, but the stated period should not be treated as a guaranteed folding-door lead time. The available product data is for a sliding window, so a project-specific schedule must be requested for folding doors.

Before placing the order, define the exact profile system, door dimensions, quantity, surface treatment, hardware, packing method, destination, and approval requirements. The Incoterm should also be agreed at this stage. Since no particular Incoterm is identified in the supplied information, it should not be assumed. The contract must name the delivery point and assign responsibility for export handling, ocean freight, insurance, import clearance, taxes where applicable, and inland delivery.

Sea freight is listed as the preferred shipping method for large quantities and long-shaped aluminium materials. However, ocean shipping time is not included in the stated 15–20-day figure unless the supplier confirms otherwise. The complete schedule may also require time for production, quality checks, packing, container loading, vessel departure, port handling, customs clearance, and delivery from the destination port.

Payment, Inspection, and Packaging

Payment conditions can influence when production begins. The stated terms for aluminium profiles are 30% D/P before manufacture and 70% before loading. For aluminium windows and doors, the arrangement is 50% D/P before manufacture with the remaining balance due before loading. Sight L/C is also supported. Confirm which payment structure applies to the folding-door order together with the Incoterm and production schedule.

Quality assurance includes 100% inspection on the production line, laboratory sampling and testing, and inspection of incoming raw materials. The company lists a CNAS Laboratory Accreditation Certificate, number CNAS L 10434, and a Quality Management System Certificate compliant with GB/T 19001-2016/ISO 9001:2015.

Project records also refer to kraft-paper wrapping, foam protection at corners, secure container loading, and safeguards against scratches, dents, and breakage during long-distance transport. If these measures are required, include them in the purchase order or packaging instructions rather than relying on an informal arrangement.

Procurement Data at a Glance

Item Available information and recommended action
Lead time The reference period is 15–20 days. Confirm whether this means production only or the complete delivery cycle.
Incoterm No Incoterm is specified. Agree the named place, freight and insurance duties, customs responsibilities, and final delivery point in writing.
Transport method Sea freight is supported and is suitable for high-volume shipments and long aluminium profiles.
Payment for aluminium windows and doors 50% D/P before manufacture and the balance before loading; sight L/C is also available.
Quality controls 100% production-line inspection, laboratory sampling and testing, plus incoming raw-material inspection.

Frequently Asked Questions

How much time should be planned for folding-door orders?

The available reference is 15–20 days. Because the supplied product record covers a sliding window, request a folding-door-specific schedule based on the final drawings, quantity, finish, hardware, and approval date.

Is there a recommended Incoterm?

The supplied information does not identify one specific Incoterm. Choose and document the term according to the agreed allocation of freight, insurance, export and import procedures, named destination, and final-mile delivery. Leaving these details open can create avoidable delays and extra costs.

Does the 15–20-day period include sea transport?

Not necessarily. No complete ocean transit duration is provided. Confirm whether the quoted period covers manufacturing only or also includes loading, maritime transport, customs processing, port handling, and inland delivery.

Practical Recommendation

Use 15–20 days as an initial planning benchmark, but obtain written confirmation of the folding-door production timeline before releasing the order for manufacture. The contract should also identify the Incoterm, named delivery point, sea-freight scope, packaging standard, payment terms, and responsibilities after arrival at the destination port.

The company states that it provides full industrial-chain distribution and direct sales. The minimum order quantity is listed as 3 tons for aluminium profiles, while the supplied sliding-window record shows a 500 sqm MOQ. Neither figure should automatically be applied to folding doors; request a product-specific quotation and MOQ. For technical assistance, contact xh@xinhealuminium.com.

About Us

Guangdong Xinhe Aluminium Co., Ltd specializes in the research, development, and manufacture of building, decorative, and industrial aluminium profiles. Founded in 1998, the company reports 1,200 employees and a factory area of 666,670 sqm. Its stated production resources include 60 modern extrusion lines, with individual capacities from 1,100 to 5,000 tons and annual output of 200,000 tons. The company holds certifications including CNAS Laboratory Accreditation Certificate CNAS L 10434 and ISO 9001:2015 quality management certification, and supplies customers in several industries.

Guangdong Xinhe Aluminium Co., Ltd logo

REPORT

Code
Choose a different language
Current language: