When a supplier builds a custom plastic mold, ownership should be established in the contract and supported by project records. Specify which tooling and related assets belong to you, how the supplier may access and use them, who can approve changes, and what happens to the mold at the end of the project. For double shot molding, document the mold design, materials, cavity layout, maintenance duties, and acceptance process before production begins.
A tooling agreement should identify the customer-funded or customer-supplied assets: the physical mold, drawings, inserts, approved samples, spare parts, and project-specific manufacturing records. It should also set clear limits on copying, transferring, or using the tooling for another customer. Define the supplier's permitted work, such as mold fabrication, trial runs, dimensional inspection, maintenance, and production support. Since no standard ownership template is specified here, have the parties confirm these terms in their contract.
Link the agreement to an approved technical file so the covered tooling can be distinguished from other projects. For a Custom Double Shot Overmolding Mold, record the two-color injection structure, steel specification, cavity arrangement, material pairing, alignment requirements, drawings, and approved samples. The available product data lists 718H / 1.2738 steel, ABS+TPU and PP+TPE compatibility, optional multi-cavity construction, and a service life of up to 800,000 shots.
Keep revisions of drawings, specifications, and sample approvals with the project file. This makes it easier to verify that the physical mold and any subsequent changes match the agreed design.
Milestone payments create a useful record when each installment corresponds to a documented event. The stated payment schedule is 50% with the order, 30% after T1 samples, and 20% before shipment. The parties can associate these stages with design approval, T1 sample sign-off, dimensional results, mold-trial records, and pre-shipment inspection. Retain the records alongside invoices and payment confirmations.
Require written results for mold trials, dimensional testing, sample approval, and pre-shipment checks. Depending on the project, listed quality methods include 3D inspection, full-dimension measurement, CMM testing, surface inspection, multiple mold-trial cycles, IQC, IPQC, FQC, and signed sample approval. These records connect the tooling to the product requirements and provide evidence of acceptance.
Specify where the mold will be stored, who has access, and how it will be returned or transferred when requested or when the project ends. The stated delivery window is 25–40 days, with sea, air, railway, and courier freight options. Record the agreed custody and shipping arrangements rather than relying on informal messages.
Set out who may repair or modify the mold, who approves the work, how costs are handled, and who retains replacement parts. Each approved change should be tied to written customer authorization and a revision record. Longterm lists online technical support, mold maintenance, spare parts supply, mold modification support, and long-term mold optimization as service options; any services used should be defined in the project terms.
| Area | Recommended record or contract term | Relevant project information |
|---|---|---|
| Tool identification | List the mold, drawings, samples, inserts, materials, cavities, and project reference | Two-color injection structure; ABS+TPU and PP+TPE; 718H / 1.2738 steel; optional multi-cavity design |
| Payment and acceptance | Make each payment contingent on a documented milestone and approval | 50% with order, 30% after T1 samples, and 20% before shipment; mold trials and dimensional tests |
| Supplier use | Define allowed production and service activities; prohibit unauthorized reuse or transfer | Custom mold manufacturing, injection molding, technical support, maintenance, and spare parts |
| Changes and repairs | Require written approval and revision records for modifications, repairs, and replacements | Online technical support, mold modification support, and optimization services are listed |
| Delivery and custody | Keep inspection results, sample sign-off, shipping records, and custody instructions | 25–40 day delivery estimate; pre-shipment inspection; sea, air, railway, and courier options |
Name the physical mold and any related assets paid for or provided by the customer, including drawings, approved samples, inserts, spare parts, and project-specific production records. For a double shot tool, also specify its injection structure, material combination, alignment requirements, cavity configuration, and steel grade.
Make payments against verifiable project events. Under the stated schedule, 50% is paid with the order, 30% after T1 samples, and 20% before shipment. Keep design confirmation, sample approval, inspection results, and trial reports as evidence for the relevant milestones.
State who is authorized to maintain or modify the mold, how the customer approves work, who covers the cost, and how parts and revisions are documented. Where applicable, include the supplier's maintenance, spare-parts, technical-support, and modification services in the agreement.
Protect custom plastic tooling by combining precise asset identification with clear use restrictions, milestone-linked payments, inspection and sample records, and documented maintenance and change procedures. Longterm provides OEM custom plastic injection molds, custom mold making with injection molding, precision and double shot molds, and mold development with mass production. Its listed quality credentials include ISO 9001:2015 certification, with inspection methods selected for each project. For technical solutions or support, contact rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited, also known as Longterm Mold, was established in 2010. It provides mold design, tooling, precision machining, mold manufacturing, and parts production for customers worldwide. The company reports 50 employees, export business serving North America, Europe, and Australia, and ISO 9001:2015 certification. Its listed project experience spans several industries, including consumer electronics, home appliances, and industrial equipment. A reported double shot overmolding project for a French product brand involved consumer electronics housings and achieved good alignment with stable trial samples.

REPORT