A clear tooling specification helps prevent mismatched expectations, costly revisions, and delays once production begins. Before authorizing a custom mold, bring the part definition, tool configuration, performance targets, inspection plan, schedule, and approval responsibilities into one written document. Review it with the supplier and record acceptance of trial samples before releasing the project to production.
Begin with the latest part drawing or a clearly identified reference sample. Include its revision, intended application, and the dimensions and features that need particular attention during inspection. The application can help guide that review: Longterm's injection tooling is used for consumer electronics, home appliances, automotive parts, industrial equipment, and everyday consumer products.
Write down the selected mold base, cavity steel, and runner system so these choices are not left to assumption. Available options include S50C or P20 mold bases, 718H, 1.2738, or S136 cavity steel, and cold or hot runners. Also state the required tolerance and expected service life. The listed reference figures are a precision tolerance of ±0.02 mm and a mold life of 50,000–1,000,000 shots; confirm targets for the specific project with the tooling supplier.
Acceptance criteria should explain how the tool and molded parts will be evaluated. Longterm's stated process includes a mold trial, dimensional inspection, and a full inspection before shipment. Identify the measurements and sample characteristics that require approval, who is responsible for sign-off, and whether production must wait until a trial sample is accepted. Keep trial results and approval records with the specification.
Longterm holds ISO 9001:2015 certification for the design, manufacture, and sale of precision molds, as well as the sale of plastic products. Regardless of certification, project-specific inspection requirements and acceptance responsibilities should still be agreed in writing.
List the expected dates or milestones for mold trials, sample review, approval, final inspection, and delivery. The product information gives a lead time of 25–40 days, but actual timing depends on the mold type and project scope. Confirm the applicable schedule directly with the supplier, including any production services.
Record how design or tooling changes will be reviewed and approved as work progresses. A case described by Longterm for a French product brand involved a double-shot overmolding tool for a consumer electronics shell. Alignment and stable trial samples were noted in the review, illustrating why configuration decisions and sample acceptance should be documented before release.
Include any after-sales arrangements in the same project record. Listed support includes online technical assistance, mold maintenance guidance, and spare parts supply.
| Area | Project details to document | Published reference information |
|---|---|---|
| Part definition | Current drawing or sample, revision, application, and inspection dimensions | Examples include electronics, home appliances, automotive, and industrial equipment |
| Tool configuration | Mold base, cavity steel, and runner type | S50C or P20 base; 718H, 1.2738, or S136 cavity steel; cold or hot runner |
| Performance | Required tolerance and target mold life | ±0.02 mm precision tolerance; 50,000–1,000,000 shots |
| Quality approval | Trial procedure, dimensional checks, sample sign-off, and shipment inspection | Mold trial test, dimension inspection, and full inspection before shipment |
| Timing and support | Agreed delivery date, review milestones, and after-sales provisions | Listed lead time of 25–40 days; online technical support, maintenance guidance, and spare parts |
Provide the part drawing or sample and fix the material and tooling choices, tolerance, expected mold life, inspection criteria, approval owners, and project schedule in writing.
Specify which dimensions and characteristics will be checked, retain the mold trial results, and name the person or team authorized to approve the sample before production proceeds.
The product listing states 25–40 days. Ask the supplier to confirm the schedule for the actual mold and scope, since lead times vary with mold type and business model.
Use a single approved specification to connect the part requirements with tool construction, performance expectations, inspection, sample sign-off, delivery, and support. Longterm offers OEM custom mold making, mold making with injection molding, precision and overmold tooling, and mold development paired with plastic injection mass production. Its company profile describes a 50-person team serving North America, Europe, and Australia. For technical solutions or support, contact Roger Luo at rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited was founded in 2010 and serves customers in the United States, Europe, Australia, and other international markets. Its 50-person team includes 7 experienced engineers. Services include mold design, tooling, precision machining, mold manufacturing, and parts production. The company holds ISO 9001:2015 certification and serves clients across multiple industries.

REPORT