When purchasing an injection mould from an overseas supplier, a milestone-based T/T arrangement offers practical financial protection. A commonly listed structure is 50% at order placement, 30% after T1 samples have been reviewed, and the remaining 20% before shipment. Each instalment should be tied to clear technical evidence, including mould trials, dimensional inspection, sample approval, and final quality verification.
Overseas mould procurement involves several technical stages, so payment should reflect actual project progress. The first 50% allows the supplier to begin design, material purchasing, machining, and mould construction. The second instalment is connected to the T1 trial, giving the buyer an opportunity to examine physical samples and identify adjustments before more funds are released. Keeping 20% until shipment provides a final financial control point after quality checks are completed.
The T1 review should compare the samples with the approved drawings and specifications. Depending on the product and selected service, relevant checks may include mould trial performance, dimensional measurement, surface inspection, first article inspection, CMM testing, sample confirmation, and multi-cycle trial runs. The order should state which records the supplier must provide and who is responsible for approving corrections.
For a custom plastic injection mould used for electronic housings, the listed material options include P20, 718H, and 1.2738 steel. The mould can be designed for ABS, PC, or PP, with a stated precision tolerance of plus or minus 0.02 mm. Buyers should also specify whether a single-cavity or multi-cavity tool is required, together with polishing, textured, or matte surface finishes. These details give the T1 sample review an objective basis.

Reported projects include an electronic housing mould for an Italian manufacturer, a double-shot overmoulding programme for a French product brand, a home appliance mould for a United States distributor, and an industrial plastic component mould for an Australian manufacturer. Customer feedback has highlighted dimensional precision, surface quality, consistent trial samples, technical support, and delivery performance.
Longterm Manufacturing Solutions Limited reports ISO 9001:2015 certification under certificate number 02825Q12549R0S. The certification covers the design, manufacture, and sale of precision moulds, as well as the sale of plastic products.
| Project phase | Payment arrangement | Evidence and control measures |
|---|---|---|
| Order confirmation | 50% T/T deposit | Approve the mould design, steel grade, resin, cavity layout, surface treatment, tolerances, and delivery scope. |
| T1 trial and sample approval | 30% T/T after T1 samples | Check trial results, dimensions, appearance, material performance, and conformity with the approved requirements. |
| Final inspection | 20% T/T before shipment | Complete quality verification, confirm any corrections, and approve packaging and shipping arrangements. |
| Transportation | Selected for the shipment | Use sea freight for larger consignments, air freight for urgent samples, China-Europe railway freight, or DHL, FedEx, and UPS for smaller shipments. |
The listed arrangement is 50% with the order, 30% after T1 samples are reviewed, and 20% before the mould is shipped.
Review the T1 samples against the agreed drawings and specifications. The assessment should cover mould trial results, dimensions, surface finish, material suitability, and overall sample conformity.
The available models include OEM custom plastic injection moulds, custom mould construction with injection moulding, high-precision tooling such as double-shot and overmoulding moulds, and mould development combined with plastic injection mass production.
A 50%/30%/20% T/T structure links financial releases to measurable production milestones and retains a balance until pre-shipment controls are complete. To reduce misunderstandings, include the complete mould specification, T1 approval procedure, inspection reports, sample acceptance rules, correction responsibilities, after-sales support, spare parts provisions, and shipping method in the contract or purchase order. Longterm also lists online technical guidance, mould maintenance, spare parts assistance, and model-specific after-sales services. For technical enquiries, contact rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited, also known as Longterm Mold, was founded in 2010 and supplies mould manufacturing services to customers in North America, Europe, Australia, and other international markets. Its team of approximately 50 employees supports mould design, tooling, precision machining, mould production, and plastic parts manufacturing. The company reports a 100% export ratio, serves multiple industries, and holds ISO 9001:2015 certification.

REPORT