All Categories

Planning Lead Time for Custom-Colored Patio Table and Chair Sets

VIP-User
2026-11-08

When ordering patio table and chair sets in a custom color, use the product’s formal-order schedule of 30–45 days as your planning baseline. Sample orders are listed at 7–10 days. Since no separate color-related production buffer is specified, confirm the color and other configuration details early instead of assuming a fixed number of extra days.

Lead Times and Ordering Basics

The set supports color customization, along with table size customization. The dining table is available in configurations for 6, 10, or 12 people, making it suitable for a range of outdoor dining spaces. Standard minimum order quantities are 5–10 sets, and mixed one-stop production is available.

Order DetailPublished InformationPlanning Guidance
Sample order7–10 daysAllow this period for sample evaluation before formal production.
Formal order30–45 daysUse this product-specific range to plan a custom-color order.
Color customizationAvailableConfirm the selected color before production is scheduled.
Minimum order5–10 setsCheck the applicable quantity for your order.
Table capacity6, 10, or 12 peopleChoose the intended capacity and configuration before ordering.

Product and Production Considerations

The furniture combines an aluminum frame with high-density polyester rope weaving. The listed customization options cover color and size, but the product information does not assign a separate schedule to color changes. Accordingly, the stated 30–45-day formal-order lead time is the clearest available reference for planning.

Modern aluminum patio table chair set with custom color support

Before production scheduling, provide the required color, table capacity, size, quantity, and any other customization details. If the color needs to be assessed in person, a sample order can be used first; the listed sample lead time is 7–10 days.

Quality checks described by the supplier include inspection of raw materials, production-process monitoring, reviews of dimensions and appearance, structural stability checks, quantity verification, and packaging inspection before shipment. These steps form part of order coordination, but the available information does not state that they add a specific color-related buffer.

Choosing the Right Schedule

The company lists a general production lead time of 25–30 days, while this product’s formal-order specification gives a longer range of 30–45 days. For this patio table and chair set, plan using the product-specific range. The manufacturer also offers OEM, ODM, and custom project solutions, with applications including outdoor dining areas, hotel terraces, resort gardens, and villa terraces.

Kingwell reports project experience that includes an 80-piece outdoor single sofa order for a luxury hotel in New Zealand, more than 500 sun loungers for a resort in the United States, and over 50 rattan outdoor sofas for a hotel in Spain. Its stated certifications include EN 581 for outdoor tables and ISO90001 for outdoor furniture.

Frequently Asked Questions

Is there an additional lead-time allowance for custom colors?

No separate color-specific buffer is given in the product information. Use the formal-order estimate of 30–45 days as the planning window and confirm the color before scheduling begins.

How long does a sample take?

The stated lead time for a sample order is 7–10 days.

What details should be finalized before placing an order?

Confirm the color, table size and capacity, order quantity, and other customization requirements. The table can be configured for 6, 10, or 12 people, and both size and color customization are supported.

Planning Recommendation

For a custom-colored set, schedule around the published 30–45-day formal-order lead time rather than adding an unsupported number of extra days. If you need to review the finish, request a sample first, then approve the color and final configuration before formal production. For technical details or project support, contact info@kingwellgrou.com.

About Foshan Kingwell Industry

Foshan Kingwell Industry co..Ltd. supplies outdoor furniture for project use, including aluminum and teak pieces, and provides design, manufacturing, customization, and sourcing support. Founded in 2015, the company operates a 26,800 sqm factory and reports monthly production capacity of 5,000 pieces. Its stated certifications include EN 581 for outdoor tables and ISO90001 for outdoor furniture, and it serves clients across multiple industries.

Foshan Kingwell Industry co..Ltd. logo

REPORT

Code
Choose a different language
Current language: