For the listed LQY148A型/D11A+3F electric bus, buyers should normally plan for a product lead time of 15–20 days. A broader 15–30-day schedule is more suitable when configuration approval, production coordination, inspection, or export arrangements may require additional time.
Sea freight is the available transportation method. However, the current product information does not name an Incoterm. The buyer and supplier must therefore agree on the applicable delivery term, cost responsibilities, customs obligations, and handover point before the order is finalized.
The vehicle is listed as the LQY148A型/D11A+3F and is associated with a “14seats bus” product keyword. Since the purchasing request concerns an 11-seater bus, the seating arrangement must be checked carefully before production begins. The approved quotation, technical drawing, production order, inspection report, and shipping documents should all show the same configuration.
This confirmation is especially important if the requested seat count involves a modified interior, different passenger layout, or changes to vehicle equipment. Written approval can help prevent discrepancies between the buyer’s order and the unit released for shipment.

The stated product lead time is 15–20 days. This is the most relevant reference when the configuration is already confirmed and the order can enter production without changes. For projects involving additional technical review, inspection scheduling, documentation, or export coordination, the wider 15–30-day business delivery range provides a safer planning allowance.
The minimum order quantity is one vehicle, so a single-unit purchase can be arranged subject to the agreed commercial terms and production schedule. Buyers should also confirm whether the lead time begins after receipt of the deposit, after technical approval, or after another milestone specified in the contract.
The available logistics information identifies sea freight but does not specify whether the transaction will use EXW, FOB, CIF, DAP, or another Incoterm. No term should be assumed from the product data. The selected Incoterm should be recorded in the purchase contract or commercial invoice together with the named destination.
The written agreement should clarify who arranges inland transport, export clearance, ocean freight, insurance, import customs clearance, unloading, and final delivery. It should also identify the point at which risk transfers from the supplier to the buyer. These details are essential for accurate landed-cost calculations and smooth shipment execution.
The stated payment structure is a 30% deposit, with the balance payable before loading. The payment schedule should be coordinated with the quality-control process. The vehicle is subject to 100% inspection-line testing and road testing, and only units that pass the required checks are approved for shipment.

Before the balance is transferred, the buyer should confirm that the approved unit matches the agreed seating capacity and technical specification. Inspection results, road-test records, photographs, and final shipping documents can be used to connect payment approval with shipment release.
The bus uses a high-strength steel frame-type longitudinal chassis beam with electrophoretic and powder-coating protection. Its listed design includes front MacPherson suspension, rear integral suspension, and a braking system intended to support controlled operation. When the standard configuration is modified, the completed vehicle should undergo the specified testing before dispatch.
The electric sightseeing bus is positioned for scenic areas, parks, visitor attractions, and shuttle routes. Langqing’s reported cooperation examples include a museum shuttle project in Egypt, a municipal sanitation project in Singapore, a Cuba shuttle bus project, and an airport shuttle bus project in Argentina. These references show experience across tourism, public-service, and transportation applications, but they do not establish a particular Incoterm for the present order.
The product information refers to 100% inspection-line testing and road testing. The company profile also lists CE certification for electric golf carts, electric sightseeing buses, and electric trucks in the European Union. Buyers should verify that the relevant documents apply to the exact vehicle configuration and destination market, especially where the requested 11-seat layout differs from the listed 14-seat keyword.
| Item | Recommended planning approach |
|---|---|
| Product lead time | Allow 15–20 days after technical and configuration approval. |
| Wider delivery window | Use 15–30 days when inspection, scheduling, or documentation may add time. |
| Transport method | Sea freight is the stated shipping option. |
| Incoterm | Not provided; agree and document the selected term with the supplier. |
| Payment terms | 30% deposit, with the balance due before loading. |
| Quality release | 100% inspection-line testing and road testing are required before shipment. |
| Minimum order | One unit. |
| Seat configuration | Confirm the requested 11-seat specification against the listed “14seats bus” information. |
Use 15–20 days as the primary product lead time. For a more conservative project schedule, allow up to 15–30 days where technical confirmation, inspection, or order coordination may affect production.
No Incoterm is stated in the available records. The buyer and supplier should select one in writing and define freight, insurance, customs, delivery, and risk-transfer responsibilities.
The product keyword identifies the vehicle as a 14-seater bus. The 11-seat requirement must therefore be confirmed in the quotation, technical specification, production order, inspection documents, and final shipping paperwork before the deposit is paid.
The stated condition is payment of the balance before loading. Buyers should coordinate this payment with completion of the required inspection-line and road tests and confirmation that the unit is qualified for shipment.
Build the order schedule around a 15–20-day production lead time, while retaining the broader 15–30-day range for safer commercial planning. Use sea freight as the stated transport method, but obtain a written Incoterm before shipment. Confirm the 11-seat configuration against the product’s 14-seat listing, and make sure the 30% deposit and balance-before-loading arrangement are tied to successful inspection and approval. For technical assistance or detailed project support, contact crystalhuang@langqing.cn.
Guangzhou Langqing Electric Car CO., LTD. was established in 2000 in Guangzhou and developed an industrial operation covering research and development, production, sales, and service. The company reports a production capacity of 1,000 units per month and serves North America, South America, Europe, the Middle East, Africa, and Southeast Asia. Its listed credentials include CE certification, and its cooperation cases cover multiple industries and regions.