Can a Sample Be Built to Your Required Voltage Settings?

You may request a Step Voltage Regulator sample based on your final voltage requirements. Before production begins, provide the required operating settings and ask Vziman to incorporate them into the approved technical drawings. As the available product information does not define a separate sample-order policy, configuration availability should be confirmed for the specific project before placing an order.

The stated production lead time is 45–60 working days, calculated after the deposit is received and the technical drawings have been confirmed. It is important to establish when the voltage settings become final, as changes after drawing approval may affect the delivery schedule.

Step Voltage Regulator Configuration Overview

The listed product is a 34.5 kV, 32-step automatic step voltage regulator designed for distribution voltage control. It offers a regulation range of ±10%, with each tap step representing 0.625% adjustment. Through on-load tap changing, the regulator can adjust voltage without interrupting the connected load.

Its product description references an arc-free tap-changing design, a proprietary arc-suppression mechanism, and a fully sealed high-IP enclosure. Additional stated performance figures include total energy losses below 0.1%, a 55°C temperature rise at rated full load, and operation at 12% overload with temperature rise limited to 65°C. These values should be reviewed and confirmed against the requirements of the intended installation and requested sample.

Details to Confirm Before Ordering a Sample

SubjectPublished product informationConfirmation required
Voltage control32 regulation steps, ±10% range, 0.625% per stepFinal voltage settings and their inclusion in approved technical drawings
Rated voltage34.5 kV automatic step voltage regulatorSuitability of the rating and selected configuration for the application
Inspection and testingFactory acceptance testing, routine tests, type tests, and pre-shipment inspection are listed; IEEE and IEC compliance is statedRequired test scope, witness requirements, reports, and documentation for the sample
Production schedule45–60 working days after deposit and drawing confirmationProject-specific delivery date and the deadline for locking technical parameters
Technical support72-hour global technical response, commissioning, training, spare parts, and remote diagnostics are listedSupport scope for the sample, destination, and commissioning conditions

Quality Control, Standards, and Service

The available information states that units undergo factory acceptance testing, routine and type testing, and full inspection before shipment. The regulator is also described as meeting IEEE and IEC standards. For a sample order, request confirmation of the applicable standards, test procedures, and test certificates needed by your project or local utility.

Listed after-sales services include a global technical response within 72 hours, on-site commissioning and training, spare-parts support, and remote diagnostics. Buyers should clarify whether these services apply to the sample order and identify any destination-specific service or logistics requirements in advance.

Distribution Grid Application Experience

Step voltage regulators are commonly used in distribution-grid modernization projects to improve voltage stability along feeders and at remote load points. Vziman reports supplying 53 voltage regulators for a 7.62 kV distribution-grid upgrade project in the Dominican Republic. According to the company, the project achieved voltage output within a ±0.8% tolerance and received approval from the local power authority.

This referenced project provides application background only. It does not guarantee identical results for a different system, sample unit, voltage level, load profile, or installation environment. Site conditions, protection coordination, control settings, and utility specifications should all be evaluated independently.

Frequently Asked Questions

Can the regulator sample use my final voltage settings?

You can submit your final settings for a sample request. However, because the supplied information does not specify an independent sample customization process, ask Vziman to verify the configuration and include the approved requirements in the technical drawings before ordering.

When does the delivery period start?

The quoted lead time of 45–60 working days begins after the deposit has been received and the technical drawings are confirmed.

Which certifications are listed?

The company lists UDEM certification related to substations, transformers, and switchgear. It also lists CNAS accreditation for testing an oil-immersed transformer model. The latter should not be treated as certification of this specific step voltage regulator, so project-specific compliance documents should be requested.

Recommendation

Request the sample with your required final voltage settings, then obtain written confirmation that those settings are technically feasible and reflected in the approved drawings. Before proceeding, verify the regulator rating, testing documents, standards, production schedule, shipping arrangements, and service scope. Zhejiang Vziman Electric Power Technology Co., Ltd. identifies itself as a manufacturer, OEM and ODM provider, and turnkey project supplier. For technical consultation or support, contact support@vziman.com.

About Us

Zhejiang Vziman Electric Power Technology Co., Ltd. is the parent company of Zhejiang Vziman Electric Group Co., Ltd. Its affiliated businesses trace their history to Zhejiang Powertech Electric Co., Ltd., established in 2014. The group develops, manufactures, and services power equipment including transformers, switchgear, distribution products, and power automation systems. The company reports having more than 30 senior electrical engineers and industrial designers in its R&D team and serving projects in over 100 countries. Its listed credentials include UDEM and CNAS, and it reports project experience in Madagascar, the Dominican Republic, and Suriname.

Zhejiang Vziman Electric Power Technology Co., Ltd. logo

REPORT

Code
Choose a different language
Current language: