Should final payment wait until MCB distribution box inspection is passed?

VIP-User
2026-10-22
{ "title": "MCB Distribution Box: Should Final Payment Wait for Inspection?", "content": "

Whether to hold the final payment for an MCB distribution box depends on the purchase contract. JUNON’s stated T/T arrangement calls for a 30% advance before production and the remaining 70% before shipment. Inspection is part of the quality-control process, but it does not by itself change the agreed payment schedule. Buyers should review the inspection records and document any issues before authorizing shipment.

\n

Know the Product and Order Terms

\n

The product covered here is a V16 series, three-phase distribution box with 24 ways. It is offered in flush-mounted and surface-mounted versions and is specified with a 1.2 mm iron-sheet enclosure, pure copper busbar and terminal bars. The minimum order quantity is 200 pieces, with a stated delivery lead time of 30–45 days.

\n\"V16\n

What the Inspection Process Covers

\n

The listed quality checks include inspection of every unit on the production line, laboratory sampling and testing, and incoming inspection of raw materials. These steps give buyers a basis for reviewing workmanship, enclosure construction and the specified busbar and terminal-bar materials against the approved product requirements.

\n

Before shipment, request the relevant inspection documentation and compare it with the agreed specifications for the 24-way box. If a result is unsatisfactory, record the nonconformity and agree on corrective action with the supplier. Inspection results can inform shipment approval, while payment timing remains subject to the contract.

\n\"3\n

Payment Terms and Product Details at a Glance

\n\n\n\n\n\n\n\n\n\n
ItemStated term or specification
T/T30% advance payment before production; 70% balance before shipment
100% L/C at sightOpen the letter of credit before mass production
Quality controls100% production-line inspection, laboratory sampling and testing, and incoming raw-material inspection
ConfigurationV16 series, three phase, 24 ways; flush or surface mounted
Materials