Delivery timelines for plastic handle full tang cutlery can be affected by more than production alone. Custom specifications, packaging preparation, quality checks, and the chosen freight method all influence when an order is ready and when it arrives. Huaqiang Metal quotes 25–35 days for its Red Handle Kitchen Tongs and 25–40 days for a standard order. New mold development may require a further 7–15 days.
Use the following estimates as a starting point for order planning. Actual schedules depend on confirmed specifications, order volume, inspection arrangements, and destination.
| Schedule Item | Estimate and Planning Notes |
|---|---|
| Red Handle Kitchen Tongs | 25–35 days. Confirm material, handle style, color, and quantity before production. |
| Standard order | 25–40 days for production, packing, and shipping arrangements. |
| New mold development | Allow an additional 7–15 days when a new mold is needed. |
| International express | About 3–7 working days, typically for samples and trial orders. |
| Air freight | Approximately 5–10 days, often selected for urgent replenishment. |
| China-Europe Railway Express | Approximately 20–25 days to European hubs. |
| Inspection and release | Material checks, in-process controls, final testing, appearance checks, and optional third-party inspection can affect dispatch coordination. |
Manufacturing includes raw-material inspection, forming and processing, handle injection or assembly, polishing, packing, and final inspection. If a check identifies an issue, the affected stage may need correction before the goods can proceed. Huaqiang Metal describes quality controls from incoming materials through finished-product sampling, with an appearance inspection before shipment.
Changes to handle color, logo engraving, or other OEM/ODM details require specification approval and production coordination. Developing a new mold adds a stated 7–15 days. Minimum quantities also vary: the Red Handle Kitchen Tongs listing gives an MOQ of 5,000 pieces, while the company's broader order information cites 2,000 pieces for standard orders and 8,000 for custom orders. Requirements can vary with material and thickness, and mixed batches are supported under the broader business model.
Standard bulk packing is listed as 300 pieces per carton. Buyers may instead request customized color boxes or other packaging specifications, which can lengthen preparation and approval. Final appearance checks take place before dispatch, so unresolved differences in product or packaging details may hold up release.
Buyers can also arrange factory audits or third-party checks through SGS or Bureau Veritas. These inspections add a coordination step, especially when their timing, scope, or reporting requirements have not been agreed before production. The company lists BSCI and ISO9001 among its credentials.
Full container load (FCL) shipping is intended for larger volumes and may be arranged through Shantou Port or Shenzhen Shekou Port under FOB, CIF, or CFR terms. Less-than-container-load (LCL) is an option for smaller consignments, typically around 1–15 CBM. Express is suited to samples and trial orders; air freight can support time-sensitive replenishment, while rail service offers another option for European deliveries.
Reported customer programs include discount and homeware retailers, cookware and furniture brands, and multinational retail groups. Promotional deadlines, private-label packaging, cost targets, and recurring high-volume replenishment can make careful production and freight coordination especially important.
Before production begins, confirm the product material, handle design and color, logo, quantity, packaging, inspection scope, and delivery terms. Approve artwork and packaging specifications early, and decide whether a standard product or new mold is required. Selecting the freight method in line with the required arrival date also helps avoid late changes.
The broader standard order estimate is 25–40 days, covering production, packing, and shipping arrangements. The Red Handle Kitchen Tongs product is listed at 25–35 days.
It can. Engraving, color-box packaging, and other custom requirements need additional coordination. A new mold, if required, is listed as taking 7–15 days. Custom orders may have an MOQ of 8,000 pieces, subject to material and thickness.
Air freight is estimated at 5–10 days for urgent replenishment. International express typically takes 3–7 working days for samples and trial orders, while China-Europe Railway Express is estimated at 20–25 days to European hubs.
JIEYANG CITY HUAQIANG METAL INDUSTRY CO., LTD., which operates under the EYAS brand, produces stainless steel tableware and kitchenware in Jieyang City, Guangdong Province. The company reports a 16,000-square-meter factory that combines design, manufacturing, packaging, and export order handling. Its stated monthly capacity is 5,000,000 pieces, and its key markets include Western Europe, North America, South America, and the Middle East. The company reports that exports account for 90% of its business.
Huaqiang Metal lists BSCI and ISO9001 certifications and serves clients in retail, homeware, cookware, furniture, and consumer electronics. Its services include direct factory supply, OEM/ODM customization, quality control, and FCL, LCL, express, air, and rail shipping options. For order planning or technical support, contact eyas2018@126.com.

REPORT