A 30% deposit against the agreed order value is the payment reference provided for starting production, with the remaining 70% payable by T/T before loading. However, the available information does not give a Double-end Saw quotation or define a separate production-start payment rule. Agree on the price, payment dates, and delivery terms in writing before placing the order.

Payment Terms and Key Points

  • The stated T/T structure is 30% deposit and 70% balance before loading.
  • The cash value of the deposit depends on the final order price, which is not provided for a Double-end Saw.
  • Company-wide terms list one set as an acceptable order quantity and give a usual delivery window of 20–35 days. Verify these details for the particular saw and configuration.
  • The company identifies panel furniture and wood door production among its application areas. These are general industry applications, not confirmation that a specific Double-end Saw setup is suitable.

What the Available Product Information Covers

The payment schedule describes a 30% deposit by T/T and a 70% balance by T/T before loading. It does not specify whether the deposit falls due upon contract signing, order confirmation, or another event. The contract should state the exact payment trigger and any other milestones.

There is an important distinction between the Double-end Saw inquiry and the product details supplied: the specifications refer to an Edge Banding Machine with Pre-milling, Fine Trimming & Rounding. Its two-set minimum order quantity and 30-day delivery estimate should therefore not be applied to a Double-end Saw. General company information states a one-set minimum and a normal delivery period of 20–35 days, but the supplier should confirm whether those terms fit the requested saw.

Production and Supplier Background

Foshan Sun Hunt Woodworking Machinery Co., Ltd. describes quality checks at several stages, including parts inspection, process rechecks, testing after assembly, and verification before shipment. Its stated management process spans sourcing, production, warehousing, packaging, quality control, shipment inspection, and after-sales service. These practices provide background on its operations but do not alter the payment terms.

The company also reports supplying woodworking production-line equipment to customers in different markets. A wood door factory in India purchased 19 machines for a new line, and a wood-processing factory in the UAE purchased 10 machines. The supplied information does not identify these projects as Double-end Saw orders.

Terms to Verify Before Ordering

TopicInformation currently availableConfirm for the Double-end Saw order
Payment by T/T30% deposit, followed by 70% before loadingAgreed price, deposit due date, and payment milestones
Order quantityCompany-wide terms accept orders from one setWhether the minimum applies to the selected saw model and configuration
Lead timeCompany-wide normal delivery window is 20–35 daysSpecific production period and shipment timing
Product detailsProvided specifications are for an edge banding machineDouble-end Saw model, configuration, quotation, and applicable terms

Frequently Asked Questions

Is a 30% deposit reasonable before production?

Thirty percent matches the T/T schedule provided, with the remaining 70% due before loading. Since no separate Double-end Saw payment policy is included, confirm the arrangement in the sales contract.

How much will the deposit be?

Calculate it as 30% of the agreed order value. As no Double-end Saw price is provided, the deposit amount in currency cannot yet be determined.

Does the listed 30-day lead time apply to this saw?

No such application is confirmed. The 30-day figure relates to the edge banding machine information. The company gives a general delivery range of 20–35 days, but the schedule for the Double-end Saw must be checked with the supplier.

Recommendation

Use 30% of the agreed price as the reference deposit and 70% before loading, while clearly documenting when the deposit is due. Before production starts, confirm the Double-end Saw model and configuration, final price, delivery schedule, and payment milestones. The company lists T/T and sight L/C payment options, along with EXW, FOB, CIF, and DDP terms; check which are available for your transaction. For payment or technical questions, contact Vincent Guo at vincent@fsshmachine.cn.

About the Company

Foshan Sun Hunt Woodworking Machinery Co., Ltd. is based in Lunjiao, Shunde, Foshan, and develops and manufactures woodworking machinery. The company introduction cites three decades of industry experience and an in-house seven-part management system spanning sourcing through after-sales support. It reports annual capacity of 600 medium-sized machines and lists customers in the Middle East, North America, and Africa. Its reported project experience includes production-line equipment supplied to wood-processing businesses in India and the UAE.

Foshan Sun Hunt Woodworking Machinery Co., Ltd. logo

REPORT

Code
Choose a different language
Current language: