In most cases, the final payment for a UV/LED Eyelash Curing Lamp should be released after the pre-shipment inspection verifies that the products comply with the approved specifications. The inspection should confirm the product model, quantity, packaging, performance and any agreed OEM or ODM details. However, the exact payment schedule depends on the signed sales agreement and may be negotiated with UBEMAY for customized or bulk orders.
Pre-shipment inspection is one stage in UBEMAY’s documented quality-control workflow. Depending on the order, the process may include incoming material inspection, functional testing, finished-product checks and a final pre-shipment review. Together, these steps give the buyer evidence that the order is ready for dispatch before the balance is paid.
The inspection should be compared with the approved order details. Confirm whether the lamp is the correct clamp-mounted, floor-standing, single-head, dual-head or modular-head version. The gooseneck should provide the agreed flexibility, and the working position, optional spot-size adjustment and selected black or white finish should correspond to the confirmed specification.

Inspection results do not automatically establish one universal payment rule. Payment remains a contractual issue. UBEMAY indicates that terms for customized and high-volume orders can be discussed based on order value, product category and the parties’ cooperation history. Buyers should confirm whether the agreement calls for a deposit, payment before shipment, payment after inspection or another arrangement.
For reference, sample purchases have a stated minimum quantity of 1 pc, while customized orders begin at 100 pcs. Standard orders are listed with an estimated 7-day delivery time, and customized production generally requires 15–30 days. These lead times should be reviewed alongside the inspection procedure and the balance-payment deadline.

UBEMAY lists CE (LVD) and CE (EMC) certifications for its LED Lash Glue Curing Lamp. The company also identifies an FDA Cosmetic Product Listing for UV Eyelash Extension Glue and FDA certification for eyelash extension products. Buyers should verify that each certification record applies to the exact product included in their purchase.
Reported projects include a private-label eyelash glue program for a United States lash brand, an eyelash extension wholesale supply project for a Brazilian distributor and a complete lash-product sourcing program for an Italian professional distributor. These examples cover private labeling, distribution and broader sourcing support.
| Order Situation | Best Time to Verify | Relevant UBEMAY Details |
|---|---|---|
| Sample purchase | Check product operation and order details before confirming how the balance will be paid | MOQ: 1 pc for samples; standard delivery: 7 days |
| Customized or private-label order | Compare function, lamp configuration, labels and packaging with the approved requirements | Custom orders start at 100 pcs; customized delivery: 15–30 days |
| Wholesale or bulk order | Review the pre-shipment inspection report before releasing the final balance when the agreement permits | Terms can be negotiated according to order value, product category and cooperation history |
| Urgent or small shipment | Confirm inspection documentation and shipment-release conditions before payment | Express, air freight, sea freight and DDP shipping options are available |
No. The available information describes a pre-shipment inspection process and flexible payment discussions, but it does not impose the same payment sequence on every order. The purchase contract determines when the final balance must be paid.
Review the lamp model, head arrangement, working position, spot-size option, color, quantity, packaging and all OEM or ODM requirements. The inspection should also include functional testing and confirmation that finished products meet the approved standard.
UBEMAY supports T/T, Alibaba Trade Assurance, PayPal, Western Union and other negotiable payment arrangements. The final option and schedule should be agreed before production or shipment.
When the sales agreement allows payment after inspection, the prudent approach is to release the final balance only after the pre-shipment review confirms the UV/LED Eyelash Curing Lamp order and shipping details. Keep a record of the inspection outcome and address confirmed discrepancies before dispatch. UBEMAY offers OEM/ODM development, private-label production, wholesale supply, bulk purchasing and small-batch support. For product or order assistance, contact sales@ubemay.com.
Guangzhou Ruiju E-Commerce Co., Ltd. operates the UBEMAY brand, supplying eyelash extensions, lash adhesives, accessories and UV/LED lash equipment to the professional beauty sector. Founded in 2014, the company supports production and sourcing for eyelash adhesives, extensions and related accessories, with schedules determined by product type, order volume and customization needs. Its primary markets include North America, Europe, the Middle East and Latin America. Listed certifications include CE (LVD) and CE (EMC) for the LED Lash Glue Curing Lamp, and the company has worked with customers in several professional and distribution markets.

REPORT