Plan seasonal Auto Parts replenishment around confirmed production and shipping dates rather than relying on a fixed reorder interval. HTH reports a delivery window of 2–25 days for its PU product business, depending on order requirements. Buyers should also confirm production availability and allow for freight, customs, and warehouse processing before expected demand increases.
Three stages shape the replenishment timeline: manufacturing, quality checks, and transportation. HTH handles PU product design, production, and sales, and describes inspections covering incoming materials, manufacturing steps, finished-product performance, structural safety, and appearance.
The available information does not specify a standard seasonal buffer or a universal reorder date for Auto Parts. Treat the stated 2–25-day delivery range as a starting point, then confirm the schedule for your product and order quantity. Add time for the chosen freight route, port handling, customs clearance, and warehousing.
HTH lists automotive PU applications such as steering wheels, armrests, headrests, safety components, airbag covers, bumpers, spoilers, dashboards, sun visors, glove compartment lids, and gearshift levers. Check the exact product specification against your needs: the referenced product specification is for a toilet armrest, not an Auto Parts item.
Quality checks described by HTH cover raw materials, production processes, finished goods, physical and mechanical performance, structural safety, and appearance. The company states that all products hold ISO9001 certification, while SGS documentation is listed for specified products, including an EVA pillow and shower seat models.
For shipment tracking, HTH supports FBA sea, air, and land freight. Shipment photographs are recorded, and buyers receive the bill of lading number and shipping order number after booking. Updates on arrival, clearance, and warehousing help purchasers follow progress and assess whether inventory will arrive before seasonal stock runs low.
| Planning item | Information to use |
|---|---|
| Delivery window | 2–25 days for the PU product business; confirm the specific schedule for the order. |
| Monthly capacity | About 50,000 pieces; verify availability for the quantity and timing required. |
| Freight choices | FBA sea, air, or land freight, selected according to the arrival deadline. |
| Shipment records | Photographs, bill of lading and shipping order details, plus progress updates. |
| Inspection scope | Checks may cover materials, production, product performance, structure, safety, and appearance. |
No dedicated Auto Parts reorder interval is provided. HTH states a 2–25-day delivery range for its PU product business, with timing dependent on order quantity and product requirements. Confirm the order schedule and add time for freight and import processing.
HTH supports FBA sea, air, and land freight. Shipment records and updates can include port arrival, customs clearance, and warehousing progress.
Confirm the automotive application, material, dimensions, quantity, quality requirements, and shipping route before placing the order. Although HTH lists several automotive PU applications, the referenced product specification concerns a toilet armrest, so request the specification for the specific part you need.
To reduce seasonal stockout risk, confirm the production window, available capacity, and transportation plan before releasing a purchase order. Use the stated 2–25-day delivery range as a planning reference, not a guaranteed seasonal lead time, and track shipment milestones through arrival, clearance, and warehousing. HTH reports a minimum order quantity of 1 piece and a one-year quality warranty. For technical details or purchasing support, contact tongxin@tongxinyz.com.
Foshan City Heart to Heart Household Wares Manufacturer designs, manufactures, and sells PU products, including bathtub pillows, backrests, cushions, armrests, shower chairs, medical instrument accessories, beauty and sports equipment accessories, furniture components, and auto parts. Established in 2002, the company operates a factory of about 5,000 square meters and reports monthly production capacity of around 50,000 pieces. Its products are exported to North America, Europe, the Middle East, and Asia. The company holds ISO9001 and CE certifications and serves customers in multiple industries.

REPORT