Purchasing multiple Medium Voltage Power Transformers for one project can create opportunities to negotiate a more competitive unit price. Vziman supports project-based orders with flexible quantities and commercial discussions, while the minimum order quantity remains one unit. However, the final transformer price is not determined by quantity alone. Capacity, voltage class, technical configuration, customization level, inspection requirements, delivery schedule, and shipping terms all influence the quotation.
For projects with several transformers using similar specifications, batch purchasing may also improve production planning, testing coordination, export packing, and logistics management. Since no standard volume-discount percentage is specified, buyers should request a project quotation based on a complete technical schedule.
A multi-unit order is generally easier to price competitively when the transformers share common electrical and mechanical requirements. For example, units with the same rated capacity, high-voltage rating, cooling method, vector group, tapping arrangement, and insulation level can simplify engineering, material procurement, and manufacturing scheduling.
In contrast, an order containing several highly customized transformer designs may require separate drawings, production plans, and testing procedures. In that case, the commercial benefit of quantity may be more limited. To obtain an accurate batch quotation, it is important to provide complete specifications for every unit rather than only the total quantity.
The oil-immersed capacity-regulating transformer is designed for medium-voltage transformation and voltage adjustment applications. Its rated capacity range extends from 100 kVA to 63,000 kVA, and available high-voltage ratings include 6 kV, 10 kV, and 35 kV. These transformers can be applied in chemical facilities, industrial distribution systems, renewable-energy power plants, and other medium-voltage power projects.
Cooling methods can be configured as ONAN, ONAF, or ODAF according to the capacity and operating requirements. Both 50 Hz and 60 Hz designs are available. For voltage regulation, off-circuit tap changing can be supplied with a range of ±2×2.5% or ±5%, while on-load tap changing may be configured with a ±8×1.25% tapping range.
Available vector groups include Dd0y11, Yd11y0, and Yy0. The transformer can also be customized for multi-pulse rectification requirements. Depending on capacity and pulse number, short-circuit impedance can range from 4.0% to 10.5%, with performance referenced to IEC 60076-5 requirements.
Listed insulation levels include 7.2 kV with LI 60 kV and AC 20 kV, 12 kV with LI 75 kV and AC 28 kV, and 40.5 kV with LI 200 kV and AC 85 kV. The insulation system uses Class A heat resistance at 105 °C. The design also targets low-noise operation below applicable standard limits.

While ordering more units may improve purchasing efficiency, the quotation will be based on the overall project scope. The following details are especially important when comparing single-unit and multi-unit transformer orders:
Standard products may have a delivery period of approximately 15 to 30 days. For this customized oil-immersed transformer, the stated lead time is 45 to 60 working days after the deposit is received and technical drawings are confirmed. For several units, the delivery plan should be reviewed against the quantity, production sequence, customization requirements, and project construction schedule.
| Purchase consideration | Single-unit purchase | Multi-unit project purchase |
|---|---|---|
| Order quantity | Available from one transformer | Project quantity can be discussed and arranged |
| Price evaluation | Based on the selected unit specification | Commercial terms may be negotiated; no fixed volume discount is published |
| Engineering coordination | One technical configuration is reviewed | Common specifications can reduce coordination across the order |
| Testing and inspection | FAT, routine test, type test, and pre-shipment inspection are available | Witness inspections and factory acceptance activities can be planned for the full project |
| Lead time | Usually 45–60 working days after deposit and drawing approval for this product | Timing depends on quantity, technical complexity, and project production planning |
| Transportation | Sea, air, or truck shipping can be selected | Sea freight is generally preferred for large equipment, with moisture-proof reinforced packing and tracking available |
Vziman provides factory acceptance testing, routine testing, type testing, and inspection before shipment. For project buyers, inspection activities can be coordinated around the production and delivery plan. The company offers manufacturer supply, OEM and ODM services, and turn-key project supply.
The stated payment arrangement is 30% deposit and 70% balance before shipment by T/T. For major project orders, an irrevocable sight L/C may also be available. Buyers should confirm payment, delivery, inspection, and shipping requirements during the quotation stage.
The company reports UDEM certification covering substations, transformers, and switchgear, along with CNAS accreditation documentation for an oil-immersed power transformer model. Its referenced project experience includes a 110 kV indoor GIS project in Suriname, a 25 MVA grid rehabilitation project in Madagascar, and a 110 kV/200 MVA transformer supply project for an industrial park in Vietnam.
It may support a lower negotiated project unit price, particularly if the transformers use shared technical specifications. The actual quotation depends on the quantity, capacity, voltage, customization, testing requirements, delivery period, and shipping conditions. No standard percentage discount is stated.
Please provide the number of units, rated power, high-voltage rating, frequency, tapping range, cooling method, vector group, insulation level, inspection requirements, destination, and expected delivery date. Technical drawing approval is required before the stated production lead time begins.
This customized oil-immersed transformer has a stated production period of 45 to 60 working days after deposit payment and technical drawing confirmation. The final schedule for multiple units should be confirmed according to the project plan and configuration complexity.
Ordering several Medium Voltage Power Transformers can provide better conditions for negotiated project pricing, coordinated inspection, consolidated packing, and shipment planning. The strongest purchasing advantage usually comes from standardizing key specifications across the transformer fleet. For the most accurate commercial offer, submit a complete technical schedule covering all units rather than requesting pricing by quantity alone.
Vziman supports manufacturer supply, OEM and ODM cooperation, and turn-key projects, with services that may include testing, inspection, overseas commissioning, training, spare parts, and remote diagnostic support. For technical consultation or quotation assistance, contact support@vziman.com.
Zhejiang Vziman Electric Power Technology Co., Ltd. is the parent company of Zhejiang Vziman Electric Group Co., Ltd. and traces its origin to Zhejiang Powertech Electric Co., Ltd., established in 2014 according to the company introduction. The company focuses on the research, production, and service of power electrical equipment, including switchgear, distribution equipment, power automation systems, and engineering services. Its manufacturing capability supports medium-voltage distribution products and project-based high-voltage equipment scheduling for customers in more than 100 countries.
The company holds UDEM certification for substations, transformers, and switchgear, as well as CNAS accreditation documentation for an oil-immersed power transformer model. Its reported cooperation cases include utility, industrial, residential, transportation, and renewable-energy projects.